Report No. 11
17. Instrument payable at a determinable future time.-
An instrument is payable at a determinate future time where it is expressed to be payable-
(a) at a fixed period after date or sight; or
(b) on, or at a fixed period after, the occurrence of a specified event which is certain to happen though the time of happening may be uncertain.1
1. See section 11, BEA.