Devendra Singh &
Ors. Vs. State of U.P. & Ors.
J U D G M E N T
H.L. Dattu, J.
1.
Leave
granted.
2.
This
appeal, by special leave, is directed against the Judgment and Order dated
08.10.2010 passed by the High Court of Judicature at Allahabad in Civil Misc.
Writ Petition No. 61903 of 2010 whereby, the writ petition filed by the
appellants challenging the acquisition of their land for construction of District
Jail by invoking Sections 17(1) and 17(4) of the Land Acquisition Act, 1894
(hereinafter referred to as "the Act") was dismissed.
3.
The
facts of the present appeal are as follows:- The District Magistrate, Jyotiba Phule
Nagar, had sent a proposal to the Principal Secretary, Home/Prisons Section 4, Government
of U.P. for acquisition of land situated at Amroha- Naugawan Sadat Road for the
construction of District Jail vide letter dated 24.01.2003. After the gap of 5 years,
the Special Secretary, Prisons Administration and Reforms, Government of U.P., had
requested the District Magistrate to find the available lands for acquisition,
for the said purpose, in the proximity of the District Head Quarters vide
letter dated 16.01.2008. Subsequently, the District Magistrate traced and
informed the availability of such lands in village Dasipur and other nearby villages
for possible acquisition to the Special Secretary vide letter dated 25.2.2008.
Thereafter, the
Special Secretary directed the Selection Committee to inspect the available lands
regarding the feasibility of their acquisition for the construction of Jail
vide letter dated 22.04.2008. Accordingly, the Selection Committee, after conducting
detailed spot inspection of the available lands, found and recommended that the
lands at village Dulhar Sant Prasad were suitable for construction of Jail on 05.05.2008.
In this backdrop, the respondent had issued a notification dated 05.03.2010 under
Section 4 read with Section 17(4) of the Act for acquisition of 20.870 hectares
of land at village Dulhapur Sant Prasad, Tehsil Amroha, Jyotiba Phule Nagar for
public purpose of construction of District Jail. The same was published in the
local newspapers on 26.03.2010.
The relevant part of the
notification is extracted below: "UTTAR PRADEHS SHASAN KARAGAR PRASHASAN
EVEM SUDHAR ANUBHAG - 4 The Governor is pleased to order the publication of the
following English translation of Notification No. 443/22-4-2010-101 (b) 2000
dated 05 March, 2010 for general information: NOTIFICATION No.
443/22-4-2010-101 (b) 2000 Lucknow: Dated 05 March 2010 Under subsection (1) of
section 4 of the Land Acquisition Act, 1894 (Act No. 1 of 1984 (sic.)), the Governor
is pleased to notify for general information that the land mentioned in the schedule
below is needed for the public purpose namely, for construction of the District
Jail in District Jyotiba Phule Nagar. Being of opinion that provisions of
subsection (1) of section 17 of the said Act are applicable to the said land in
as much as the said land is urgently required for construction of the District Jail
in District Jyotiba Phule Nagar and that in view of the pressing urgency it is as
well necessary to eliminate to delay likely to be caused by an enquiry under
section 5-A of the said Act the Governor is further pleased to direct, under subsection
(4) of section 17 of said Act, that the provisions of section 5-A shall not
apply."
4.
4).
Since the appellants' land was also included in the notification, they made representations
dated 07.04.2010 and 20.08.2010 to the Land Acquisition Officer, the District Magistrate,
Jyotiba Phule Nagar, the Chief Minister and the Home Secretary, Government of
U.P. with the request that their land may not be acquired as they had raised construction
of houses, tube wells and lands are under cultivation. They also suggested the availability
of large tracts of alternative lands with no construction and irrigation
facility situated within one Kilometer towards North. However, the concerned authorities
did not reply to these representations of the appellants. Subsequently, the appellants,
aggrieved by the said notification, filed Writ Petition No. 22252 of 2010
before the High Court of Judicature at Allahabad, which was dismissed vide its Order
dated 22.04.2010 without deciding any issue on merits on the ground that the
writ petition is premature as the declaration under Section 6 has not been issued.
The High Court further
granted liberty to the appellants to raise all the available grounds, including
the applicability of Sections 17(1) and 17(4) of the Act, in order to challenge
the acquisition of their land once the State Government proceeds to issue Notification
under Section 6(1) of the Act. Thereafter, the State Government issued a Notification
dated 06.08.2010 under Section 6 read with Section 417(1) of the Act whereby,
it directed the Collector of Jyotiba Phule Nagar to take possession of the said
land on the expiry of 15 days from the date of publication of the Notice under
Section 9(1) even in the absence of any award being made under Section 11.
Eventually, the
Public Notice dated 03.09.2010 was issued, which expressed the intention of the
Government to take possession of the said land, in which it was directed to the
appellants to appear before the Special Land Acquisition Officer, Jyotiba Phule
Nagar. The appellants, being aggrieved, filed a Writ Petition before the High Court
of Judicature at Allahabad interalia questioning the correctness of the
Notification dated 5.3.2010 issued under Section 4 read with Section 17(4) and Notification
dated 6.8.2010 issued under Section 6 read with Section 17(1) thereby dispensing
with the opportunity of hearing and enquiry under Section 5-A of the Act.
The High Court, vide
its impugned Judgment and Order dated 8.10.2010, dismissed the Wirt Petition
and allowed the respondents to proceed further with acquisition of the said
land in terms of the Act on the ground that the construction of the District Jail
is an urgent matter which has been mentioned in the Notification under Section
4 as the very purpose of acquisition of the land. Aggrieved by this Judgment
and Order of the High Court, the appellants are before us in this appeal.
5.
The
issue involved in the present appeal for our consideration is: Whether the respondent
is justified in invoking the urgency provision under Section 17(1) and excluding
the application of Section 5-A in terms of Section 17(4) of the Act for acquisition
of the land for construction of District Jail.
6.
The
learned counsel Shri. Prashant Kumar submits that the district of Jyotiba Phule
Nagar came into existence on 24.04.1997. Since then, the State Government had not
shown any kind of urgency and was only considering the proposal of acquiring the
land for the public purpose of construction of the District Jail. It was only in
the year 2010 that the State Government had issued Notifications under Sections
4 and 6, invoking urgency provision as contemplated by the Sections 17(1) and
17 (4). In other words, the lackadaisical attitude of the State Government since
the creation of the new district nearly 13 years ago does not exhibit or depict
any kind of urgency but only lethargy on their part in acquiring the land.
Therefore, the
urgency contemplated in the Act cannot be equated with dereliction of
responsibility on the part of the State Government. The learned counsel contends
that the respondents had unnecessarily invoked the urgency provisions under Section
17 (1) read with Section 17 (4) for acquisition of the land for construction of
the District Jail in view of the delay of 13 years in the issuance of the
Notification under Section 4 of the Act and still, the said land is under the possession
of the appellants. The learned counsel argues that invoking of the urgency
provisions under Section 17(4), which excludes the application of Section 5-A, by
the respondents in the absence of any real urgency as contemplated by Section
17, amounts to illegal deprivation of the right to file objection and hearing
of the appellants under Section 5-A of the Act. He submits, relying on various decisions
of this Court, that the expropriatory legislation like Land Acquisition Act must
be given strict construction.
He further submits
that Section 5-A is a substantial right and akin to Fundamental Right which embodies
a principle of giving of proper and reasonable opportunity to the land owner to
persuade the authorities against the acquisition of his land which can be dispensed
with only in exceptional cases of real urgency. The learned counsel relies on the
decision of this Court in Dev Sharan & Others v. State of U.P. (2011) 4 SCC
769 in support of his contention that dispensing with the opportunity of hearing
and enquiry under Section 5-A of the Act in view of prolonged lethargy of
almost 13 years on the part of respondents by invoking emergency provisions
under Section 17 is illegal and unjustified. The learned counsel has further
cited catena 7 of Judgments of this Court in support of his arguments which has
already been dealt with by this Court in Radhy Shyam v. State of U.P. (2011) 5
SCC 553.
7.
Per
Contra, the learned senior counsel Shri. K.K. Venugopal submits that the newly
created district of Jyotiba Phule Nagar does not have a District Jail to lodge
the prisoners of the district who are presently accommodated in the Moradabad District
Jail, wherein the total population of inmates exceeds by more than three times the
capacity of the Jail, causing great hardships to inmates. Further, producing of
the prisoners from Moradabad Jail to various Courts in Jyotiba Phule Nagar
raises financial and security concerns. He submits that since the creation of the
new district, the State Government has been making continuous efforts for
acquisition of land to construct the District Jail.
However, the process of
construction of Jail could not be carried forward due to subsequent dissolution
of the district vide Notification dated 13.04.2004, which was challenged before
the High Court and later, the High Court quashed the said Notification of
Dissolution. Pursuant to this Order of the High Court, the district was recreated
in 2004. He further submits that the State Government had issued a Notification
dated 5.3.2010 under Section 4 read with Section 17 (4) of the Act for acquisition
of the said land for public purpose of urgent construction of Jail in the newly
created district by invoking Section 17(4) of the Act in order to eliminate delay
likely to be caused by enquiry under Section 5-A of the Act. Subsequently, in view
of the said urgency, the State Government had issued Notification dated 6.8.2010
under Section 6 read with Section 17(1) of the Act and published it in the
Newspaper along with a Public Notice under Section 9 of the Act dated 20.08.2010,
all within a period of 5 months. Further, the respondents, after hearing the objections
and claims of the appellants dated 03.09.2010 regarding the compensation and measurement
of the land under Section 9 of the Act, handed over the possession of the said land
to the Senior Superintendent of Jails, Mordabad, on 07.01.2011.
The learned senior counsel
submits that there is no lethargy or negligence on the part of the State Government
to acquire the said land. He further supports the observation of the High Court
in the impugned Judgment that construction of Jail is an urgent matter requiring
acquisition of the land by invoking urgency provisions under Section 17 (1) and
Section 17(4) thereby dispensing with the enquiry under Section 5-A of the Act.
He further contends that the right of the citizens of filing of objections and opportunity
of hearing under Section 5-A are subject to the 9 provisions of Section 17 of the
Act and the same can be legally curtailed in the event of any pressing need and
urgency for acquisition of land in order to eliminate delay likely to be caused
by an enquiry under Section 5-A of the Act.
The learned senior counsel
further submits that Dev Sharan's Case (Supra) upon which, the appellant had
placed strong reliance is not relevant and applicable to the present case because
in that case, this Court invalidated the acquisition of land by invoking
urgency provisions for construction of a new Jail when old Jail was already
existed in District Shahjahanpur but was located in a densely populated area which
needs to be shifted. Learned Senior Counsel has placed reliance on the decisions
of this Court in Deepak Pahwa v. Lt. Governor of Delhi, (1984) 4 SCC 308 and Chameli
Singh v. State of U.P., (1996) 2 SCC 549 in support of his arguments that even the
delay and lethargy on the part of the respondents will not disentitle them to
invoke urgency provisions under Sections 17 of the Act.
8.
8).
The issue before us is no more res integra as it has already been decided by this
Court in Radhy Shyam's Case (Supra) in which one of us was the party (G.S.
Singhvi, J.) wherein this Court has considered the development of the
jurisprudence and law, with 10respect to invoking of the urgency provisions
under Section 17 vis-`-vis right of the landowner to file objections and
opportunity of hearing and enquiry under Section 5-A of the Act, by referring
to plethora of earlier decisions of this Court. This Court had culled out various
principles governing the acquisition of the land for public purpose by invoking
urgency thus:
"From the analysis
of the relevant statutory provisions and interpretation thereof by this Court in
different cases, the following principles can be culled out: (i) Eminent domain
is a right inherent in every sovereign to take and appropriate property belonging
to citizens for public use. To put it differently, the sovereign is entitled to
reassert its dominion over any portion of the soil of the State including private
property without its owner's consent provided that such assertion is on account
of public exigency and for public good -- Dwarkadas Shrinivas v. Sholapur Spg. and
Wvg. Co. Ltd.46, Charanjit Lal Chowdhury v. Union of India47 and Jilubhai Nanbhai
Khachar v. State of Gujarat48. (ii) The legislations which provide for
compulsory acquisition of private property by the State fall in the category of
expropriatory legislation and such legislation must be construed strictly -- DLF
Qutab Enclave Complex Educational Charitable Trust v. State of Haryana49; State
of Maharashtra v. B.E. Billimoria50 and Dev Sharan v. State of U.P.242 (iii) Though,
in exercise of the power of eminent domain, the Government can acquire the private
property for public purpose, it must be remembered that compulsory taking of one's
property is a serious matter.
If the property belongs
to economically disadvantaged segment of 11the society or people suffering from
other handicaps, then the court is not only entitled but is duty-bound to
scrutinise the action/decision of the State with greater vigilance, care and circumspection
keeping in view the fact that the landowner is likely to become landless and deprived
of the only source of his livelihood and/or shelter.(iv) The property of a
citizen cannot be acquired by the State and/or its agencies/instrumentalities without
complying with the mandate of Sections 4, 5-A and 6 of the Act.
A public purpose, however,
laudable it may be does not entitle the State to invoke the urgency provisions because
the same have the effect of depriving the owner of his right to property
without being heard. Only in a case of real urgency, the State can invoke the urgency
provisions and dispense with the requirement of hearing the landowner or other
interested persons.( v ) Section 17(1) read with Section 17(4) confers extraordinary
power upon the State to acquire private property without complying with the mandate
of Section 5-A. These provisions can be invoked only when the purpose of acquisition
cannot brook the delay of even a few weeks or months.
Therefore, before excluding
the application of Section 5-A, the authority concerned must be fully satisfied
that time of few weeks or months likely to be taken in conducting inquiry under
Section 5-A will, in all probability, frustrate the public purpose for which
land is proposed to be acquired.(vi) The satisfaction of the Government on the issue
of urgency is subjective but is a condition precedent to the exercise of power under
Section 17(1) and the same can be challenged on the ground that the purpose for
which the private property is sought to be acquired is not a public purpose at all
or that the exercise of power is vitiated due to mala fides or that the authorities
concerned did not apply their mind to the relevant factors and the records.
vii) The exercise of
power by the Government under Section 17(1) does not necessarily result in exclusion
of Section 5-A of the Act in terms of which any person interested in land can file
objection and is entitled to be heard in support of his objection. The use of word
"may" in sub- section (4) of Section 17 makes it clear that it merely
enables the Government to direct that the provisions of Section 5-A would not apply
to the cases covered under sub-section (1) or (2) of Section 17. In other words,
invoking of Section 17(4) is not a necessary concomitant of the exercise of
power under Section 17(1).
( viii ) The acquisition
of land for residential, commercial, industrial or institutional purposes can be
treated as an acquisition for public purposes within the meaning of Section 4
but that, by itself, does not justify the exercise of power by the Government
under Sections 17(1) and/or 17(4). The court can take judicial notice of the
fact that planning, execution and implementation of the schemes relating to development
of residential, commercial, industrial or institutional areas usually take few years.
Therefore, the private property cannot be acquired for such purpose by invoking
the urgency provision contained in Section 17(1). In any case, exclusion of the
rule of audi alteram partem embodied in Sections 5-A(1) and (2) is not at all
warranted in such matters."
9.
9).
In view of the above it is well settled that acquisition of the land for public
purpose by itself shall not justify the exercise of power of eliminating enquiry
under Section 5-A in terms of Section 17 (1) and Section 17 (4) of the Act. The
Court should take judicial notice of the fact that certain public purpose such
as development of residential, commercial, industrial or institutional areas by
their intrinsic nature and character contemplates planning, execution and implementation
of the schemes which generally takes time of few years. Therefore, the land acquisition
for said public purpose does not justify the invoking of urgency provisions under
the Act. In Radhy Shyam (Supra), this Court, whilst considering the conduct or
attitude of the State Government vis-`- vis urgency for acquisition of the land
for the public purpose of planned industrial development in District Gautam Budh
Nagar, has observed:
"In this case, the
Development Authority sent the proposal sometime in 2006. The authorities up to
the level of the Commissioner completed the exercise of survey and preparation of
documents by the end of December 2006 but it took one year and almost three
months for the State Government to issue notification under Section 4 read with
Sections 17(1) and 17(4). If this much time was consumed between the receipt of
proposal for the acquisition of land and issue of notification, it is not possible
to accept the argument that four to five weeks within which the objections could
be filed under sub-section (1) of Section 5-A and the time spent by the Collector
in making enquiry under sub-section (2) of Section 5-A would have defeated the
object of the acquisition."
10.
10).
Moreover, in Dev Sharan Case (Supra) the acquisition of land for construction
of new District Jail, since the old Jail was overcrowded and causing hardships including
health and hygiene concerns to the inmates, by invoking urgency 14provision
under Section 17 was quashed on the ground that the government machinery had
functioned at very slow pace in processing the acquisition which clearly
evinces that there was no urgency to exclude the application of Section 5-A of the
Act. The Court further observed: "35. From the various facts disclosed in the
said affidavit it appears that the matter was initiated by the Government's Letter
dated 4-6-2008 for issuance of Section 4(1) and Section 17 notifications. A
meeting for selection of a suitable site for construction was held on 27-6-2008,
and the proposal for such acquisition and construction was sent to the
Director, Land Acquisition on 2-7- 2008.
This was in turn forwarded
to the State Government by the Director on 22-7-2008. After due consideration of
the forwarded proposal and documents, the State Government issued Section 4 notification,
along with Section 17 notification on 21-8-2008. These notifications were published
in local newspapers on 24-9-2008. 36. Thereafter, over a period of 9 months,
the State Government deposited 10% of compensation payable to the landowners, along
with 10% of acquisition expenses and 70% of cost of acquisition was deposited, and
the proposal for issuance of Section 6 declaration was sent to the Director, Land
Acquisition on 19-6-2009. The Director in turn forwarded all these to the State
Government on 17-7-2009, and the State Government finally issued the Section 6 declaration
on 10-8-2009. This declaration was published in the local dailies on 17-8-2009.
Thus the time which elapsed
between publication of Section 4(1) and Section 17 notifications, and Section 6
declaration in the local newspapers is 11 months and 23 days i.e. almost 15 one
year. This slow pace at which the government machinery had functioned in processing
the acquisition, clearly evinces that there was no urgency for acquiring the land
so as to warrant invoking Section 17(4) of the Act. 38. In Para 15 of the writ petition,
it has been clearly stated that there was a time gap of more than 11 months between
Section 4 and Section 6 notifications, which demonstrates that there was no urgency
in the State action which could deny the petitioners their right under Section 5-A.
In the counter which was
filed in this case by the State before the High Court, it was not disputed that
the time gap between Section 4 notification read with Section 17, and Section 6
notification was about 11 months. 39. The construction of jail is certainly in public
interest and for such construction land may be acquired. But such acquisition can
be made only by strictly following the mandate of the said Act. In the facts of
this case, such acquisition cannot be made by invoking emergency provisions of
Section 17. If so advised, the Government can initiate acquisition proceeding by
following the provision of Section 5-A of the Act and in accordance with law."
11.
In
the facts and circumstances of the present case, it is clear that the District of
Jyotiba Phule Nagar was created in the year 1997 which was, however, dissolved and
recreated in 2004. The District Magistrate, Jyotiba Phule Nagar, had sent a
proposal to the Principal Secretary, Home/Prisons, Government of U.P. for acquisition
of land for the construction of District Jail on 24.01.2003 which is
undoubtedly a public purpose. After the lapse 16 of 5 years in the year 2008,
the State Government asked District Magistrate to trace availability of lands for
acquisition for construction of the District Jail in the proximity to District Headquarters
and further requested the Selection Committee to recommend the land suitable
for the said purpose.
Thereafter, the Selection
Committee recommended the acquisition of the said land as suitable for the
construction of the Jail but it took two years for the State Government to
issue the said Notifications under Section 4 and Section 6 respectively, thereby
invoking the urgency provisions under Section 17 of the Act. The series of
events shows lethargy and lackadaisical attitude of the State Government. In
the light of the above circumstances, the respondents are not justified in invoking
the urgency provisions under Section 17 of the Act, thereby depriving the appellants
of their valuable right to raise objections and opportunity of hearing before the
authorities in order to persuade them that their property may not be acquired.
12.
The
decision of this Court in Chameli Singh (Supra), upon which Shri. K.K. Venugopal,
learned senior counsel for the respondents has placed reliance, has already been
considered and distinguished by this Court in Radhy Shyam Case (Supra) in the following
terms: 17 "74. In State of U.P. v. Pista Devi, Rajasthan Housing Board v. Shri
Kishan and Chameli Singh v. State of U.P. the invoking of urgency provision contained
in Section 17(1) and exclusion of Section 5-A was approved by the Court keeping
in view the acute problem of housing, which was perceived as a national problem
and for the solution of which national housing policy was framed and the imperative
of providing cheaper shelter to Dalits, tribals and other disadvantaged sections
of the society."
13.
Learned
senior counsel for the respondents also relied on the decision of this Court in
Deepak Pahwa Case (Supra). In that case, the land was acquired by invoking urgency
provisions under Section 17 for the purpose of construction of a New
Transmitting Station for the Delhi Airport after the correspondence of nearly eight
years among the various Departments of the Government before the Notification and
the declaration was published in the Gazette. This Court has held that mere pre-notification
delay would not render the invocation of the urgency provisions void as very often,
the delay increases the urgency of the necessity for acquisition. We are afraid
that the decision will not come to the rescue of the respondents because this Court
has observed that delay only accelerates or increases the urgency of need of acquisition,
which contemplates that delay does not create a ground or cause for urgency but
increases the already existing urgency for acquisition of land for any public
purpose. Therefore, the delay, by itself, does not create urgency for acquisition
but accelerates urgency only in case it already exists in the nature of the public
purpose.
14.
For
the reasons aforesaid, we hold that the State Government was not justified, in
the facts of this case, to invoke the emergency provision of Section 17(4) of the
Act. Therefore, the appellants cannot be denied of their valuable right under
Section 5-A of the Act.
15.
In
the result, the appeal is allowed. The impugned Judgment and Order of the High Court
dated 08.10.2010 is set aside. No order as to costs.
..............................J.
[ G.S. SINGHVI ]
..............................J.
[ H. L. DATTU ]
New
Delhi,
August
03, 2011.