T.N. Godavarman
Thirumulpad Vs. Union of India & Ors [2006] Insc 970 (15 December 2006)
Y.K.
Sabharwal , Dr. Arijit Pasayat & S.H. Kapadia
I.A. No.
1150 IN I.A. No.1010 WITH
I.A. 1010 WITH
I.A. 1458 IN I.A. 1010 IN I.A. 670 IN WRIT PETITION ( C ) No. 202 OF 1995 Dr.
ARIJIT PASAYAT, J.
These I.As.
are in essence oft shoot of a judgment of this Court in IA 670 of 2001 in Writ
Petition (C) 202 of 1995 in K.M. Chinnappa (applicant in T.N. Godavarman Thirumulpad
v. Union of India and Others (2002 (10) SCC 606). It related to the question
whether functioning of Kudremukh Iron and Ore Company Ltd. (in short 'KIOCL')
was having adverse effect on the environment and ecosystem. In paras 51 and 52
of the judgment it was inter alia directed as follows:
"51.
Taking note of the factual background and the legal position highlighted above,
we think it proper to accept the time period fixed by the Forest Advisory
Committee constituted under Section 3 of the Conservation Act. That means
mining should be allowed till the end of 2005 by which time the weathered
secondary ore available in the already broken area should be exhausted. This
is, however, subject to fulfilment of the recommendations made by the Committee
on ecological and other aspects.
52.
The modalities as to how these have to he worked out shall be done in the
manner recommended by the Committee. It was submitted by the learned counsel
for the State of Karnataka that the recommendation made about
transfer of buildings and other infrastructure to the Forest Department of the
State Government at book value is not acceptable to it. This is a matter which
can be considered by the Committee on an appropriate motion being made by the
State before it. The modalities to be adopted to effectuate the order passed by
this Court and recommendations of the Committee shall be worked out by the
Ministry of Environment and Forests, the State Government and the Company under
the supervision and guidance and monitoring of the Committee."
Unfortunately the Central Government for reasons best known to it
notwithstanding the clear position indicated in the judgment construed that the
expression "Committee" meant "Forest Advisory Committee"
(in short 'FAC'). There was no scope for taking the stand in view of what has
been stated in para 5 of the judgment. It has been stated that FAC is also a
statutory committee. By order dated 20th January, 2006 it has been observed
that the constitution of the Monitoring Committee is not in consonance with the
directions of this court.
Learned
counsel appearing for KIOCL submitted that in line with direction of this Court
and keeping in view the Rule 23C of the Mineral Conservation and Development
Rules, 1988 (in short the 'Rules') which became operative with effect from
10.4.2003, an approved final Mine Closure Plan was submitted. Views of expert
bodies were taken. It has been stated that in line with the statutory
prescriptions, which even though became operative after the judgment various
steps have been taken. Indian Bureau of Mines (in short the 'IBM') has also
given its report. It is, therefore, stated that though IIT Delhi was asked to
give its view but that has no relevance. If there would have been
non-compliance with the statutory requirement of Rule 23C of the Rules, it
would have exposed it to penal consequences. In essence the stand is taken that
IIT Delhi's report should not be accepted and the following modalities on the
other hand should be adopted.
(a) It
would utilize its machinery and workmen for the purpose of achieving slope
stability by excavating the 33.81 hectares on the basis that out of the net
profit generated by the mining operation, 50% of the net profit would be paid
over to a fund to be established and operated by a committee constituted by the
Government of Karnataka or in any other manner directed by this Court or a high
powered statutory committee created for this purpose (in the nature of the
Tennessee Valley Authority) for the purpose of utilizing this 50% net profit
for rehabilitation and eco-restoration for the Kudremukh Forest Area. (b) On a
rough estimate, the 50% of net profit is likely to be in the range of Rs.50 to
75 crores per annum, for the purpose of rehabilitation and eco-restoration of
the Kudremukh National Park and also establishing and promoting sustainable
environmental development and eco- tourism in the area. Towards this end, the
existing buildings and infrastructure could also prove useful. (c) If this
proposal is accepted, an amount in the range of (approximately) Rs.150 Crores
to 225 Crores could be available to the fund during the period of about 3 years
which would be necessary for excavating 33.81 hectares.
It is
further submitted that in the judgment at paras 49 and 51 had permitted mining
of the weathered secondary ore in the already broken up area till the end of
2005, as this Court expected that the weathered ore would be exhausted.
But in
reality, about 20 million tons of weathered ore are still available in already
broken up area. This should be permitted to be used as it is likely to generate
revenue of about rupees 25 crores per annum. If this is permitted nearly rupees
300 crores would be available to the Kudremukh Authority for Eco Restoration
Fund which would be able to bring about dramatic change in the eco-system of
the Kudremukh National Park.
Per
contra, learned Amicus Curiae has submitted that this Court clearly directed
closure of mining operation by the end of 2005. Time was not given for running
the mines for profit, but as a winding down period at the end of which mining
should have been closed. The operations during the period had to be under the
supervision of the Monitoring Committee which in turn function under the
supervision of Central Empowered Committee (in short 'CEC'). What KIOCL wants
now is to continue mining of 8 to 9 lakh tonnes of ore.
We
have considered rival submissions. IIT, Delhi was appointed vide order dated 24th February, 2006. It has been found that KIOCL has
used the concerned period for carrying on commercial operations without taking
necessary steps for winding down operations. On 10th May, 2006 an affidavit was filed by KIOCL taking the stand that there
was likelihood of serious pollution of Bhadra river if KIOCL was not allowed to
do the operations for the purpose of avoiding pollution. IIT, Delhi did not consider the exercise
necessary. It has been pointed out by learned Amicus Curiae that contrary to
what KIOCL thought to be inevitable, there was no damage whatsoever despite
heavy monsoon. It is to be noted that the IIT, Delhi in its report has observed
that the solution has to be found by experts and the heart-beat of that
solution is the stability of the slopes involving "no or minimal
disturbance to the unbroken area". It is noted that at various times,
petitions have been filed practically with a view to undo what had been
definitely held to be imperative by this Court.
At
this juncture, it would be appropriate to take note of what IIT, Delhi stated in its various reports.
In
their report dated 12th
April, 2006 on the
Stability of Slope and related issues during mine closure of KIOCL, it was
inter alia observed as follows:
"3.0
Observations on Stability of Slopes Based on the above methodology, the
following observations are made concerning the stability of the slopes.
(a)
The excavated slopes of the mine exist at varying degrees of steepness with
benches of variable widths.
(b)
Some slopes are stable with grass growing on them; others are observed to show
signs of surficial erosion/debris flow/mud flow; yet others show signs of
planar slippage or slides of limited depth.
(c)
The instability of slopes at specific locations is observed to be on account of
(i) excessive
steepness,
(ii) inadequate
strength of soil/rock mass under saturated condition and
(iii) seepage
pressure exerted by infiltrating rain water during monsoons.
(d)
Saturation of mine slopes and seepage pressure exerted on the slopes appear to
be the two factors that have the greatest role in instability of slopes since
these slopes are reported to be relatively stable during dry months and become
unstable during monsoons. Saturation reduces the strength of the soil/rock mass
and seepage pressure induces downward movement.
4.0
Observations on Instability of North West Part of the Mining Area One part of
the mining area on the north western side is observed to be particularly
susceptible to slope instability due to collection of water in a catch pit
constructed at the base of the broken area, above the unbroken area.
The
catch pit was constructed by excavation during mining operations and is
observed to cause the following effects:
(a)
The unbroken area on the downstream side of the catch pit is being destabilized
as the collected water seeps into the unbroken area;
(b)
When the catch pit overflows, uncontrolled flow of water cascades downhill in
the form of surface water laden with silt which eventually reaches the Bhadra River at the base of the unbroken area; this has also resulted in
the formation of gullies and erosion channels in the unbroken area.
5.0
Observations on Slope Stability Aspects in the Closure Plan Slope stability
aspects have been covered in the following reports in the Closure Plan:
Report
of NIRM: Slope Stability Investigations at Kudremukh Iron Ore Mines Report of
CWPRS: Desk Studies on Stability of Hill Slopes in Mining Area at Kudremukh
Iron Ore Mine, Karnataka The Closure Plan proposes stabilization of the slopes
by flattening them and also by additional excavation of slopes in the broken
region as well as the unbroken portion in the northwestern part of the mine.
This would be followed by revegetation of slopes for controlling erosion of
fine material. Check dams have been proposed to prevent siltation of the Bhadra River during the initial stages till vegetative growth gets
established and causes reduction in silt erosion.
The
following are the observations on slope stability aspects in the closure plan:
(a)
The suggested methodology of stabilizing the north west part of the mine by deep excavation in the unbroken portion
over an area of 33.81 hectares can be one alternative but not necessarily the
only one. Other methods which would minimize disturbance to the unbroken area
could have been examined.
(b) In
addition, the following aspects have not been covered in the Closure Plan:
i) A
surface water drainage plan for the entire mining area indicating location of
surface water drains at the benches and along the perimeter of the base of the
mining area;
ii)
Methodology for periodic removal and relocation of silt collected in check dams
and catch pits;
iii)
Provision of bio-geotechnical engineering measures for assisting vegetative
growth in problematic areas where regular debris flow or mud flow is observed;
iv)
Stability measures for north west part of the mine such as elimination of
collection of water and overflow of water from the existing catch pit as well
as stabilization measures for the unbroken area destabilized by the catch pit;
v) The
measures listed at (i) to (iv) above could result in significant additional
costs.
6.0
Conclusions and Recommendations
(a)
The slopes are not stable in the present state and need stabilization.
(b) If
the mine is abandoned without stabilization of the slopes, as indicated
earlier, it will result in excessive silt discharge due to erosion as well as
in the sliding of the slopes at some locations in future years.
(c)
The north west part of the mine needs immediate
attention and remedial measures to prevent the possible occurrence of large
scale movement during the forthcoming monsoon.
(d) A
Closure Plan is necessary for stabilizing the slopes. The Closure Plan proposed
at present is well conceptualized but falls short of adequacy in detailing (as
indicated in 5.0 (a) and (b) above). This is perhaps so because there is
inadequate experience in the country regarding closure of mines of such size in
a short time. The regulations relating to closure have been notified only in
recent years in the country and it will take time for the expertise to develop
fully.
(e) It
is suggested that the task of mine closure be given, on a turnkey basis, to an
Organization having requisite experience in similar works (on design- and-build
basis). Such an Organization can be selected through a global competitive bid.
It should be the responsibility of such an Organization to reanalyze the
stability of slopes and then draw up a Closure Plan and execute it with minimum
disturbance to unbroken area of the mine. KIOCL could assist such an
Organization in executing the closure. Since the execution of closure would
involve a large expenditure and a time frame of several years for vegetation to
be established, such a task could be overseen by a special cell/nodal agency
created for this purpose.
(f)
The award of work as listed in (e) above could take several months. Till then,
KIOCL need to monitor and maintain the slopes (in the entire mine area in
general and the northwestern portion in particular) as well as maintain/operate
the silt control measures at the site.
Again
on 12th June, 2006 the report of Expert Committee made
certain observations on the basis of presentation made by KIOCL officers on
various dates. The observations were to the following effects:
"Officers
of KIOCL, headed by Mr. J.N. Kini, Director (Production & Projects), made a
presentation at IIT Delhi on 8th June 2006
on the measures taken to for controlling silt and for stability of north
western portion. A report was also submitted containing conceptual design and
detailed design of water pollution control measures. The following were
present:
Mr.
J.N. Kini KIOCL Mr. K.S. Kasinath. KIOCL Mr. G. Pai, KIOCL Mr. MK. Rajagopalan,
KIOCL Prof. G.V. Rao, Member, Expert Committee Prof. K.G. Sharma, Member,
Expert Committee Prof. Manoj Datta, Member, Expert Committee All the three
members of the Expert Committee visited the mine site on 10th and I1th June
2006 to study the measures taken." The following are the observations of
the Expert Committee members on the basis of the presentation by KIOCL
officers, report submitted by them and the site visit.
"Silt
Control Measures
1. It
is observed that concerted efforts have been made by KIOCL for controlling the
flow of silt from the mine site to the Bhadra river in the form of drainage
channels, catchpits, berms and dykes, check bunds and check dams.
2.
From amongst the two main pollution control dams, one is observed to be nearly
full (PCD 1) whereas significant storage capacity exists in the other (PCD2).
3.
Attempts have been made by KIOCL, to the extent feasible, to empty the
reservoir behind PCD1 and these have been abandoned with the onset of monsoons.
Further attempts can be tried during periods of extended lull in the monsoon,
if any.
4.
Diversion of silt laden water has been made at select locations from drainage
channel of PCD1 to the drainage channel of PCD2.
5. It
is stated by officers of KIOCL that the storage capacity of the main catchpit
before PCD2 as well as the reservoir of PCD2 is sufficient to hold most of the
silt for the present monsoon. However measures have to be taken for handling
the silt of future years.
6. The
upsteam slope of PCD2 is observed to exhibit evidence of piping. Remedial
measures such as provision of geotextile filter and plugging have been
undertaken by KIOCL.
Suitable
long term measures may be taken up after the monsoons. Careful monitoring of
both PCD2 and PCDI may be done during and after the monsoons.
7. It
is observed that silt laden water from the north-west portion does not reach
either PCDI or PCD2 but overflows from the low lying area in the north west portion into the Bhadra river through
an erosion gully. A gabion structure has been constructed to control the silt
but the possibility of silt overflow during heavy rains can not be ruled out.
Additional measures are required to control the silt release from this area.
KIOCL has proposed the re-profiling of the north west portion to enable the silt laden water to reach PCD2. This would take
around 6 months and can be taken up only after the monsoons. Other alternatives
with conceptual and detailed plans need to be considered for this problem.
Stability
of North-West portion
1. The
stability of the North-West region is observed to be slightly improved on
account of non-accumulation of water in the low-lying area.
2.
However, the stability could still be affected due to the presence of erosion
gully because of overflowing water.
3.
Complete access to the periphery of the low-lying area is not available due to
the absence of benches and access roads.
4. It
is important that a few alternate solutions be ccnceptualized with the
following features for the north west
region as long term measures:
(a)
Minimal accumulation of water,
(b)
Drainage channel to reach PCD2,
(c)
Benches to stabilize steep slopes,
(d)
Access load all around the low-lying area, and
(e)
Sealing of opening(s) to the erosion gully(ies).
Final
Remarks KIOCL may prepare revised conceptual designs and remedial measures on
the basis of the observations made in this report." On 13.7.2006 the
opinion of IIT, Delhi in the background of the affidavit
filed by KIOCL on 10th
May, 2006 was as
follows:
"The
Expert Body of IIT Delhi has studied the affidavit filed by KIOCL. The
following are the views of the Expert Body in respect of item 3 titled
"Achieving Slope Stability in the Entire Mine Area".
1. For
stability of slopes of the mine area, the scope of work defined by KIOCL to
NIRM for their study did not specify the condition of "no or minimal
disturbance to unbroken area".
As a
consequence, the NIRM report presents only one solution, which disturbs the
broken area. It does not give any other alternative solutions.
2.
Other reports by IIT Kharagpur, CMRI Dhanhad, Monitoring Committee, CWPRS Pune,
use the report of NIRM as the bases of analysis, hence give recommendations
similar to that of NIRM.
3. As
stated in the earlier Report submitted by the Expert Body on 10th April 2006, it is reiterated that a solution
to the stability of slopes with no or minimal disturbance to unbroken area is
feasible.
4.
Flattening of unstable slopes by excavation in broken area along with appropriate
drainage and silt control measures can improve stability of the mined area. For
this purpose the mechanism already suggested at item 6(e) of Expert Body Report
dated 10th April 2006 submitted to Hon'ble Supreme Court
may be adopted." The significant aspects in the aforesaid report are as
follows:
(a)
The scope of work defined by KIOCL to NIRM for their study did not specify the
condition of "no or minimal interference to unbroken area".
(b)
Other reports (i.e. of IIT, Kharagpur, CMRI, Dhanbad, Monitoring Committee,
CWPRS, Pune used NIRM's report as the foundation for analysis and, therefore,
their recommendations were similar to those of NIRM.
(c)
Solution to the stability of slopes with no or minimal disturbances to unbroken
area is feasible.
(d) By
adopting certain measures, stability of the mined area can be improved.
In the
background of what has been noted above, and keeping in view the suggestions
and recommendations of IIT, which we find to be founded on rational basis, we
direct as follows:
(i) On
the basis of the report dated 10.04.2006 of IIT Delhi through a Global
Competitive Bid an Agency to be selected for:
(a) re-analysing
the stability of slopes
(b)drawing
up of mine closure plan and
(c)
implementation of the above plan.
(ii)
IIT Delhi shall draw up detailed terms for the work to be done, consistent with
the basic paradigm of "no or minimal disturbance to unbroken area"
and submit to this Court within a period of four weeks for further directions.
(iii)
The Ministry of Mines, Government of India, shall designate an officer to take
over possession of the mines immediately. IIT Delhi shall depute a team of
experts to go and do a survey of the mines and the surrounding area and submit
a report to this Court regarding any immediate step(s) that need to be taken
during the interregnum till the appointment of the expert agency. IIT Delhi can
ask the designated officer to take any necessary steps on an emergent basis.
(iv)
The expenditure for the purpose of inviting global competitive bid and
evaluation such as on advertisement etc. may initially be met out of Rs.19 crores
deposited by the KIOCL, and which are presently lying with the Adhoc- CAMPA.
(v) If
any funds are required in excess of the aforesaid amount, the Agency, or the
Designated Officer shall move this Court for necessary directions." I.A.s are
accordingly disposed of.