Prakash
Khandre Vs. Dr. Vijaya Kumar Khandre & Ors [2002] Insc 268 (9 May 2002)
M.B.
Shah, Bisheshwar Prasad Singh & H.K. Sema Shah, J.
Appeal (civil) 1455 of 2002
In the
background of facts briefly stated below, questions for determination in these
appeals are
1. In
an Election Petition under the Representation of the People Act, 1951
(hereinafter referred to as 'the Act'), when contest for election to the post
of MLA is by more than two candidates for one seat and a candidate, who was
disqualified to contest the election, is elected whether the Court can declare
a candidate who has secured next higher votes as elected? And
2.
Whether contract between the elected candidate and the Government was
subsisting on the date of scrutiny of nomination papers? Appellant Prakash Khandre
contested election from No.2- Bhalki Constituency of Karnataka State
Legislative Assembly and was declared elected. Respondent no.1 Dr. Vijay Kumar Khandre
contested the said election but was defeated. The details of the votes secured
by each candidate are as follows: - Sl.No. Name of the Candidate No. of Votes
Difference Polled
01. Shri
Prakash Khandre 47,132 | | 10327
02.
Dr. Vijay Kumar Khandre 36,805 |
03.
Sri Bheemanna Kolle 660
04. Shri
Shivaraj Patil 1,054
05.
Sri Siddaramaiah S. Swamy 177
Respondent
no.1 challenged the said election by filing Election Petition No.25/99 and
contended that declaration of election dated 5.9.1999 resulting in favour of
the appellant was illegal and void. He prayed that he may be declared as duly
elected to Karnataka State Legislative Assembly on the ground that under
Section 9-A of the Act, appellant was disqualified to contest the election as
there were subsisting contracts entered into by him in the course of his
business with the State Government.
Further,
a voter Mr. Baswaraj D. Honna - appellant in C.A. No.1455 of 2002 also filed
Election Petition No.30/99 for a declaration that election of Mr. Prakash Khandre
was void under Section 100(1)(a) and Section 100(1)(d)(i) of the Act.
Appellant
also filed Recrimination Petition under Section 97 of the Act praying that in
the event of his election to the constituency being declared void, respondent
No. 1 Dr. Vijay Kumar Khandre should not be declared as elected as he is guilty
of corrupt practices as specified in Section 123 of the Act.
The
High Court of Karnataka at Bangalore [Mr.
Justice A.V.Srinivasa Reddy] by its judgment and order dated 21.12.2001 allowed
the election petition filed by respondent No.1 and the election of appellant
was declared void under section 100(1)(a) on the ground that work of effective
improvement and asphalting of Halburga- Bawgi-Kamtana road was continued to be
carried out by Prakash Khandre even after purported closure of contract. With
regard to the rest of the contract works, the High Court held that contracts
were terminated. The Court also declared that the votes polled by the elected
candidate would become wasted and, therefore, Dr. Vijay Kumar Khandre who has
secured the next highest number of valid votes has to be declared elected under
Section 101 of the Act and was declared accordingly. That order is challenged
by Prakash Khandre by filing Civil Appeal Nos.2-3 of 2002. Civil Appeal No.
1455 of 2002 is filed by Basavaraj D. Honna.
At the
time of admission of this matter, by order dated 18.1.2002, the Court granted
interim relief as under:
"Appeals
admit.
The
impugned judgment is stayed thereby entitling the appellant only to attend the
Assembly Sessions and sign the register but he will neither participate in the
proceedings nor vote nor draw remuneration in his capacity as Member of the
Legislative Assembly till the disposal of the appeals. Any further documents to
be filed by either party be filed within four weeks from today.
These
appeals may be listed for final disposal in the second week of March, 2002.
On the
other respondents, dasti notice is permitted." Re: Question No.1 At the
time of hearing of these appeals, learned senior counsel Mr. Ashok Desai
submitted that the order passed by the High Court declaring election-petitioner
Dr. Vijay Kumar Khandre as elected is, on the face of it, illegal and erroneous
as election was contested by 5 candidates and in support of his submission, he
referred to various decisions rendered by this Court. As against this, Mr. K.N.
Bhat, learned senior counsel for respondent No.1 submitted that the High Court
rightly declared Dr. Vijay Kumar Khandre as elected and the decision of the
High Court is based on the provisions of Section 101 of the Act.
For
appreciating the aforesaid submissions, we would first refer to the relevant
provisions of the Act, namely, Sections 53, 84 and 101 of the Act which are as
under:
"53.
Procedure in contested and uncontested elections.
(1) If
the number of contesting candidates is more than the number of seats to be
filled, a poll shall be taken.
(2) If
the number of such candidates is equal to the number of seats to be filled, the
returning officer shall forthwith declare all such candidates to be duly
elected to fill those seats.
(3) If
the number of such candidates is less than the number of seats to be filled,
the returning officer shall forthwith declare all such candidates to be elected
and the Election Commission shall by notification in the Official Gazette call
upon the constituency or the elected members or the members of the State
Legislative Assembly or the members of the electoral college concerned as the
case may be, to elect a person or persons to fill the remaining seat or seats.
Provided
that where the constituency or the elected members or the members of the State
Legislative Assembly or the members of the electoral college having already
been called upon under this sub-section, has or have failed to elect a person
or the requisite number of persons, as the case may be, to fill the vacancy or
vacancies, the Election Commission shall not be bound to call again upon the
constituency, or such members to elect a person or persons until it is
satisfied that if called upon again, there will be no such failure on the part
of the constituency of such members.
84.
Relief that may be claimed by the petitioner.
A
petitioner may, in addition to claiming a declaration that the election of all
or any of the returned candidates is void, claim a further declaration that he
himself or any other candidate has been duly elected.
101.
Grounds for which a candidate other than the returned candidate may be declared
to have been elected.If any person who has lodged a petition has, in addition
to calling in question the election of the returned candidate, claimed a
declaration that he himself or any other candidate has been duly elected and
the High Court is of opinion
(a) that
in fact the petitioner or such other candidate received a majority of the valid
votes; or
(b)
that but for the votes obtained by the returned candidate by corrupt practices
the petitioner or such other candidate would have obtained a majority of the
valid votes, the High Court shall, after declaring the election of the returned
candidate to be void declare the petitioner or such other candidate, as the
case may be, to have been duly elected." From a reading of sub-section (2)
of Section 53, it is clear that if number of candidates is equal to number of
seats to be filled, the returning officer has to declare all such candidates to
be duly elected to fill those seats, meaning thereby it would be uncontested
election.
Further,
if the number of contesting candidates is more than the number of seats to be
filled, a poll is required to be taken. Finally, after taking poll if one
candidate is declared elected and there are only two candidates who contested
for the election, and if it is found that elected candidate was disqualified
for one or other reason for being declared to be elected then his election
would be set aside and unsuccessful candidate, if otherwise eligible, could be
declared as elected and that relief could be granted in view of Section 53 read
with Section 84 of the Act.
However,
the question which requires consideration isif there are more than two
candidates for one seat and the elected candidate is subsequently found to be
disqualified, whether the candidate who has secured more votes than remaining
candidates should be declared as elected or not? For this, we would consider
the ingredients of Section 101 which inter alia provide that after declaring
election of returned candidate to be void, the High Court may declare the
petitioner or such other candidate to have been duly elected if (a) in fact the
petitioner or such other candidate received a majority of valid votes; or (b) but
for the votes obtained by the returned candidate by the corrupt practices, the
petitioner or such other candidate would have obtained a majority of the valid
votes.
Therefore,
the first ingredient for declaring the election- petitioner or other candidate
to have been duly elected depends upon error for various reasons in counting of
valid votes and if it is found that in fact the petitioner or such other
candidate received a majority of valid votes, he is to be declared elected.
Second
ingredient provides for establishing that the votes obtained by the returned
candidate were obtained by corrupt practices and but for such votes the
petitioner or such other candidate would have obtained a majority of valid
votes. Say as in the present case, the difference between the elected candidate
and the election petitioner is of 10327 votes and if it is established that
elected candidate obtained more than 10327 votes by corrupt practices then
petitioner or such other candidate who has obtained majority of valid votes
could be declared as elected.
However,
in an election where elected candidate is declared to be disqualified to
contest election and there are more than two candidates contesting election,
there is no specific provision under the Act under which the person who has
secured the next highest number of votes could be declared as elected. The Act
is silent on this point.
Further,
it cannot be presumed that the votes secured by the disqualified elected
candidates would have been wasted or would have been secured by the next
candidate who has secured more votes.
If
disqualified candidate was not permitted to contest the election then how the
voters would have voted in favour of the candidate who has secured more votes
than other remaining candidates would be a question in the realm of speculation
and unpredictability. In such a situation, declaring the election of the
returned candidate on the ground of his initial disqualification to contest the
election by itself would not entitle the election petitioner or any other
candidate to be declared elected.
The
learned counsel for the parties referred to various decisions rendered by this
Court and we would refer them in chronological order. The Constitution Bench of
this Court in Konappa Rudrappa Nadgouda v. Vishwanath Reddy and another [(1969)
2 SCR 90] dealt with the case where one Vishwanath Reddy was declared elected
to Mysore Legislative Assembly and that election was challenged by Nadgouda who
was a contesting candidate on the ground that Reddy was disqualified from
standing as a candidate for election. This Court by order dated 19th July, 1968 held that election of Reddy was
void and that votes cast in his favour be treated as thrown away. The Court
held "as there was no other contesting candidate, we declare the appellant
(election petitioner) as elected to the seat from the Yadgiri
constituency." That order was challenged by filing a review application
which was granted and question whether it was open to the Court on finding
recorded about disqualification of Reddy to declare Nadgouda as duly elected to
the Mysore Legislative Assembly was dealt with and decided. The Court referred
to earlier decision in Keshav Laxman Borkar v. Dr. Devrao Laxman Anande [(1960)
1 SCR 902], wherein it was held that a candidate whose nomination paper is
accepted after scrutiny, is a validly nominated candidate "at least for
the purpose of receiving votes at the election", and that the candidate
must be treated as a person for whom votes could be given.
The
Court on that view held that where there are only two candidates for a seat and
the election of the candidate declared elected is set aside on the ground that
he was disqualified, the defeated candidate cannot be declared elected, and
there must be a fresh election. In the opinion of the Court the votes cast in favour
of the disqualified candidate cannot be said to be thrown away unless there is
a "special pleading" that certain voters had cast their votes with
the knowledge or notice that the candidate for whom they had voted was not
eligible for election, and they had deliberately thrown away their votes in favour
of the disqualified person; in the absence of such a plea it cannot be said
that the votes cast in favour of a person who was by law disquaslified from
being nominated, but who was in fact nominated, were thrown away. In the
opinion of the Court a defeated candidate out of the two who contested the
election may be declared elected under section 84 read with section 101 of the
Act, if he proves that the voters had notice of the disqualification of the
successful candidate.
The
correctness of the said view was challenged before the Constitution Bench. The
Court considered various English decisions cited at the bar and observed that
the cases decided by the Courts in the United Kingdom appear to have proceeded
upon some general rule of election law that the votes cast in favour of a
person who is found disqualified for election may be regarded as thrown away
only if the voters had notice before the poll of the disqualification of the
candidate. Thereafter, the Court pertinently observedbut in our judgment the
rule which has prevailed in the British Courts for a long time has no
application in our country. The rule enunciated in U.K. has only the merit of antiquity; the rule cannot be
extended to the trial of disputes under our election law, for it is not
consistent with our statute law, and in any case the conditions prevailing in
our country do not justify the application of that rule. The Court also
considered Section 53 of the Act and held that it renders a poll necessary only
if there are more candidates contesting the election than the number of seats
contested and if the number of candidates validly nominated is equal to the
seats to be filled, no poll is necessary and where by an erroneous order of the
returning officer poll is held which, but for that order, was not necessary,
the Court would be justified in declaring those contesting candidates elected,
who, but for the order, would have been declared elected.
Thereafter,
the Court observed thus "When there are only two contesting candidates,
and one of them is under a statutory disqualification, votes cast in favour of
the disqualified candidate may be regarded as thrown away, irrespective of
whether the voters who voted for him were aware of the disqualification. This
is not to say that where there are more than two candidates in the field for a
single seat, and one alone is disqualified, on proof of disqualification all
the votes cast in his favour will be discarded and the candidate securing the
next highest number of votes will be declared elected. In such a case, question
of notice to the voters may assume significance, for the voters may not, if
aware of the disqualification have voted for the disqualified candidate."
The Court also considered Section 101 and held as under "....The votes
obtained by corrupt practice by the returned candidate, proved to be guilty of
corrupt practice, are expressly excluded in the computation of total votes for
ascertaining whether a majority of votes had been obtained by the defeated
candidate, and no fresh poll is necessary. The same rule should, in our
judgment, apply when at an election there are only two candidates and the
returned candidate is found to be under a statutory disqualification existing
at the date of the filing of the nomination paper." In Thiru John and
Another v. Returning Officer and Others [1977 (3) SCR 538], the Court dealt
with the biennial election to the Rajya Sabha from the State of Tamil Nadu
where the voting pattern is single-transferable vote wherein the elected
candidate Shri John was found by the Court to be statutorily disqualified for
election. The Court considered the question whether the votes secured by such
candidate be regarded as 'thrown away' and in consequence the next candidate be
declared elected? In that context the Court observed: - "Again, the answer
to this question, in our opinion, must be in the negative. It is nobody's case
that the electors who voted for Shri John, had at the time of election,
knowledge or notice of the statutory disqualification of this candidate. On the
contrary, they must have been under the impression that Shri John was a
candidate whose nomination had been validly accepted by the returning officer.
Had the electors notice of Shri John's disqualification, how many of them would
have voted for him and how many for the other continuing candidates, including Sarv
Shri Subramanyan and Mohan Rangam, and in what preferential order, remains a
question in the realm of speculation and unpredictability." The Court also
referred to the following observations made by Hidayatullah, C.J. speaking for
the Court in R.M. Seshadri v. G.Vasantha Pai [1969 (1) SCC 27] rejecting
similar contention:- "This (question) will depend on our reaching the
conclusion that but for the fact that voters were brought through this corrupt
practice to the polling booths, the result of the election had been materially
affected. In a single transferable vote, it is very difficult to say how the
voting would have gone, because if all the votes which Seshadri had got, had
gone to one of the other candidates who got eliminated at the earlier counts,
those candidates would have won. We cannot order a recount because those voters
were not free from complicity. It would be speculating to decide how many of
the voters were brought to the polling booths in car. We think that we are not
in a position to declare Vasanta Pai as elected, because that would be merely a
guess or surmise as to the nature of the voting which would have taken place if
this corrupt practice had not been perpetrated." And, thereafter the Court
held as under: - "The position in the instant case is no better. It is
extremely difficult, if not impossible, to predicate what the voting pattern would
have been if the electors knew at the time of election, that Shri John was not
qualified to contest the election. In any case, Shri Subramanyan was neither
the sole continuing candidate, nor had he secured the requisite quota of votes.
He cannot therefore, be declared elected:" The Court also considered the
dictum in the case of Viswanath (supra) and observed that the ratio decidendi
of said case is applicable only where (a) there are two contesting candidates
and one of them is disqualified; and (b) the election is on the basis of single
non- transferable vote.
Again
in Lata Devi (Mali) v. Haru Rajwar [(1989) 4 SCC 773], this Court dealt with
the same question and observed as under: - ".It is to be noted that in an
election petition what is called in question is the election and what is
claimed is that the election of all or any of the returned candidate is void,
with or without a further declaration that the election petitioner himself or
any other candidate had been duly elected. Declaring the election of the returned
candidate void does not, by itself, entitle the election petitioner or any
other candidate to be declared elected." Learned counsel for the appellant
lastly referred to the decision in D.K. Sharma v. Ram Sharan Yadav and Others
[(1993) Supp 2 SCC 117]. In that case, the High Court referred to the decision
in Konappa Rudrappa Nadgouda (supra) and held that on the basis of the oral
evidence, it was not possible to hold that the voters who cast their votes in favour
of the elected candidate did so after having noticed about the disqualification
and knowing that their votes would be wasted and therefore, the second prayer
of the election petitioner to declare him as duly elected after throwing away
the votes of elected candidate, was not allowed. This Court did not find any
infirmity in the said reasoning and, therefore, dismissed the appeal.
In
view of the aforesaid settled legal position, in our view, the impugned order
passed by the High Court declaring the election petitioner as elected on the
ground that the votes cast in favour of elected candidate (appellant) are
thrown away was totally erroneous and cannot be justified. As held by the
Constitution Bench in Konappa's case that some general rule of election law
prevailing in the United Kingdom that the votes cast in favour of a person who
is found disqualified for election may be regarded as 'thrown away' only if the
voters had noticed before the poll the disqualification of the candidate, has
no application in our country and has only merit of antiquity. We would observe
that the question of sending such notice to all voters appears to us alien to
the Act and the Rules. But that question is not required to be dealt with in
this matter. As stated earlier, in the present case for one seat, there were five
candidates and it would be impossible to predict or guess in whose favour the
voters would have voted if they were aware that elected candidate was
disqualified to contest election or if he was not permitted to contest the
election by rejecting his nomination paper on the ground of disqualification to
contest the election and what would have been voting pattern. Therefore, order
passed by the High Court declaring the election petitioner Dr. Vijay Kumar Khandre
as elected requires to be set aside.
Re:
Question No.2.
Whether
Contract between the Government and Appellant was subsisting on the date of
scrutiny of nomination papers? Finding given by the High Court:
On
this question, we would first refer to the finding given by the High Court. The
learned Judge held that out of seven contracts between appellant and the State
Government, six contracts were terminated. But from the evidence on record, he
held that the work of effective improvement and asphalting of Halburga-Bawgi-Kamtana
road was continued to be carried out by Prakash Khandre even after the
purported closure of contract, that is, subsequent to the writing of the
letters and, therefore, as a matter of fact there was subsistence of contract
between him and PWD. For this purpose, the learned Judge relied upon Ex.118
wherein the name of the contractor appeared to be Mr. Prakash Khandre and the
likely date of completion was shown as December 1999. He has also placed
reliance upon Ex. 105 which is a measurement book pertaining to Halbarga Bawgi
works and held that if these works were carried out by Mallikarjun Khandre
after 1.9.99, the entries under various columns could not have born the details
of the contract as entered into by Prakash Khandre and the name of the
contractor would also have been mentioned as Mallikarjun Khandre.
He
held that except letters and agreements Ex. 71 and 72, there was nothing on
record to show that the department closed the contract of Mr. Prakash Khandre.
He further referred to the evidence of Mallikarjun Khandre and held that Earnest
Money Deposit was not given by him to the authority. He, therefore, held that
the department as well as Mallikarjun Khandre did not actually treat the work
allotted to Mallikarjun Khandre as a fresh contract and there appeared to be
mere substitution of Mallikarjun Khandre in place of Prakash Khandre. With
regard to the rest of the contract works, he arrived at the conclusion that the
contracts were not subsisting. He finally arrived at the conclusion that
election of Mr. Prakash Khandre was void under Section 100(1)(a) of the Act as
he was disqualified under section 9-A of the Act on the date of scrutiny of
nomination papers, on the date of election and on the date of declaration of
result and it was declared as such on that count.
SUBMISSIONS:
Learned
senior counsel Mr. Ashok Desai for the appellant submitted that once the
contract is terminated by writing various letters by the appellant and when
such termination is accepted by the Department, it inevitably means that
contract does not subsist.
Further,
the moment registration of the contractor is cancelled and no dues certificate
is issued, it would mean that contracts were terminated. The Government
cancelled registration of Prakash Khandre as Class-I contractor on 16.8.1999
and issued no dues certificate. It is his submission that appellant has
unequivocally terminated the contracts and that is accepted by all witnesses
from the Public Works Department examined by the election petitioner.
Therefore,
there was no reason for the learned Judge to hold that Halbarga-Bawagi contract
works continued. It is his submission that prior to termination of the contract
95% of the work was over and 5% of the work remained to be completed but the
appellant was required to terminate the contract as elections for the
legislative assembly were preponed. For this purpose, he referred to the cost
of the actual contract work as per the tender, which was for a sum of Rs.3,21,97,034/-.
He pointed out that out of that he has completed the work of Rs.2,90,42,705/-.
For the work done by him prior to termination of the contract, he had received
Rs.2,31,52778/- and had recovered remaining amount by instalments in the months
of September/October/November and December, but that does not mean that
appellant has carried out further contract work. He pointed out that whatever
amount he had received after termination of the contract was for the work done
by him prior to termination of the contract.
Learned
senior counsel Mr. Shanti Bhushan appearing for the election petitioner submitted
that the finding of the High Court that the contracts between the appellant and
the State Government were subsisting is based upon appreciation of evidence and
the said appreciation cannot be said to be in any way erroneous. It is his
contention that contracts were not terminated and the appellant continued the
contract work through his brother as benamidar. He submitted that from the
evidence on record, it is proved that the contracts were subsisting. It is his
further contention that mere cancellation of registration would not be
sufficient to arrive at the conclusion that contract was terminated. He heavily
relied upon certain Exhibits and submitted that there was tampering of evidence
by the Department in favour of the appellant. It is his say that transfer of
work in favour of Mallikarjun Khandre was as such benami.
Statutory
Provision:
Before
dealing with the facts, we would refer to relevant statutory provision. Under
the Act, disqualification on the ground of subsistence of contract was first
provided under Section 7(d) which reads as under "7. A person shall be
disqualified for being chosen as, and for being, a member of either House of
Parliament or of the Legislative Assembly or Legislative Counsel of a State (d)
if, whether by himself or by any person or body of persons in trust for him or
for his benefit or on his account, he has any share of interest in a contract
for the supply of goods to, or for the execution of any works or the
performance of any services undertaken by the appropriate Government."
Thereafter it was amended by Act 58 of 1958 which read thus:- "7. A person
shall be disqualified for being chosen as, and for being, a member of either
House of Parliament or of the Legislative Assembly or Legislative Council of a
State.
(d) if
there subsists a contract entered into in the course of his trade or business
by him with the appropriate Government for the supply of goods to, or for the
execution of any works undertaken by, that Government." The aforesaid
section was replaced by Section 9A by Act 47 of 1966 which came into force from
14th December 1966. It reads thus: - "9A. Disqualification for Government
contracts, etc.A person shall be disqualified if, and for so long as, there subsists
a contract entered into by him in the course of his trade or business with the
appropriate Government for the supply of goods to, or for the execution of any
works undertaken by, that Government.
Explanation. For the purposes of this section,
where a contract has been fully performed by the person by whom it has been
entered into with the appropriate Government, the contract shall be deemed not
to subsist by reason only of the fact that the Government has not performed its
part of the contract either wholly or in part." The objects and reasons
for substituting Section 7(d) by Section 9A are as under:
"Apart
from the grouping of the sections effected by clause 20, some changes have also
been made in the relevant provisions. In the new section 9-A, an Explanation
has been added to make it clear that a contract with the Government shall be
deemed not to subsist by reason only of the fact that the Government has not
performed its part of the contract either wholly or in part. This change has
become necessary in order to do away with the disqualification that attaches to
a person for being chosen as or for being a member of Parliament or State
Legislature even after he has fully performed his part of the contract, since
it would hardly be justifiable to retain such a disqualification provision in a
modern welfare State when State activities extend almost over every domain of
the citizen's affairs where very many persons, in one way or the other, have
contractual relationship with the Government. That being the case, an unduly
strict view about Government contract in the present day might lead to the
disqualification of a large number of citizens many of whom may prove to be
able and capable members of Parliament or State Legislatures.
It
would be of interest to note in this connection that in the United Kingdom, any
disqualification arising out of any contract with the Crown has been done away
with by the House of Commons Disqualifications Act,1957." From the
afore-quoted objects and reasons of substituting Section 9-A, it is clear that
unduly strict view about the Government contract in the present day is not
required to be taken and the change became necessary in order to do away with
the disqualification that attach to a person for being chosen as or for being
member of the Parliament or State Legislature even after he has fully performed
his part of the contract.
Further,
initially section 7(d) was very wide. A person having any share or interest in
contract or such person having interest by any person in trust for him or for
his benefit or on his own account was disqualified to contest election. This
disqualification was narrowed down in 1958. Thereafter in 1966, Section 9-A was
substituted, which provides that the person shall be disqualified (a) if and
for so long as there subsists a contract by him in course of his trade or
business;
(b) for
the supply of goods to; or (c) for the execution of any work undertaken by him.
Explanation
further provides that where the contract has been fully performed by the person
by whom it has been entered into the contract shall be deemed not to subsist by
reason only of the fact that Government has not performed its part of the
contract either wholly or in part. This explanation is added to clarify that
mere non performance on the part of the Government, say non payment of money would
not be deemed to mean that contract subsists even though the contract has been
fully performed by such person.
In Ranjeet
Singh v. Harmohinder Singh Pradhan [(1999) 4 SCC 517] this Court (in para 7)
observed thus:
"Section
9-A is a statutory provision which imposes a disqualification on a citizen. It
would, therefore, be unreasonable to take a general or broad view, ignoring the
essentials of the section and the intention of the legislature. Purposive
interpretation is necessary. In Dewan Joynal Abedin v. Abdul Wazed [1988 Supp
SCC 580] Section 9-A of the Act has been correctly interpreted in the following
words:- "An analysis of Section 9-A of the Act shows that only in two
cases a person would be disqualified if he has entered into a contract with the
appropriate Government in the course of his trade or business which is
subsisting on the date of scrutiny of nomination. They are (i) when the
contract is one for supply of goods to the appropriate Government and (ii)
where the contract is for the execution of any works undertaken by that
Government." Correspondence for Termination of Contract: - In the light of
the aforesaid statutory provision, to find out whether contract was subsisting
on the date of filing of nomination, we would first refer to the letters
written by the appellant to the Department for terminating the contracts and
the action taken by the Department on the basis of the said letters.
Copy
of letter dated 4.8.1999 (Ex.R-5) To The Executive Engineer PWD Bidar Division Bidar.
Sir,
Sub: Regarding Finalisation of Works and Issue of No.
Due
Certificate and Cancellation of My Registration (Licence).
======
I am contesting for the forth-coming Assembly Election.
Hence
I request you kindly to finalise the works which are entrusted to me in your department
even if the works are incomplete, as per rules. I also request you to issue me
the No Due Certificate and cancel my registration of contractorship.
Further
I write to state that I am also managing a partner of M/s C. Saraswati &
Sons, Engineer and Contractor, Bhalki. So now I want to retire from the
partnership which may kindly be accepted.
Early action
in the matter is requested and issue me the No Due Certificate immediately.
Thanking
you sir, Yours faithfully, Sd/- (Prakash Khandre)" Copy of letter dated
6.8.1999 (Ex.P-55) To Chief Engineer Communication and Building Government of
Karnataka Bangalore.
Sir,
Sub: Termination of Contract with the Government in respect of various works
which will be set-out herein below.
======
I am the Class-I contractor of the Government of Karnataka. I intend to contest
the ensuing election for the Legislative Assembly. Hence I pray as hereunder:
1. As
a contractor I have been entrusted the various works mentioned herein below:
(a)
Improvements and Asphalting of Halburga-Bawgi- Kamtana in Bidar district
completed 95% of the work. Balance 5% work not completed due to EIRL not
approved by the Department.
(b)
Improvement and Asphalting of Dhannara Pati to Chandapur KM 0/0 5/6 completed
30% of the work. Due to rains the work is stopped.
(c)
Improvement and Asphalting of Mahagoan to Shulepeth Work started in the month
of April 1999 25% of the work is completed due to rains the work is stopped.
(d) In
KM 76 RBC Canal lining in KPCC Division Balki construction of the work not
started. Due to rains the work is not started due to Election coming I am not
ready to start the work.
(e) Bijapur
to Athani Work completed Final bill to be submitted by Department.
(f) Sholapur
Chitradurga NS 13 KM 237/0-256/0 work completed but final bill to be submitted
by department.
(g) In
Bijapur NH Division, the PR Work on Sholapur Chitradurga Road in KM 32/0-97/0
184/0 183/0 and KM 217/0 227/0 Work order received, tender agreement also
completed Work to be done after rainy season.
In
respect of the works referred to above I have completed the work substantially.
In view of the rainy season and incessant rains in Bidar District, the
aforesaid work could not progress so as to complete the work before August,
1999. I humbly state that I undertook the various works referred to above with
an intention to complete them by end of November, 1999. As pointed out by me
earlier I intended to contest the ensuing election for the Assembly Elections.
In view of the pre-ponement of the election and for the reasons beyond my
control, I could not complete the aforesaid work.
2. As
you may be aware the Election Commission of India has issued the calendar of
Events. The last date for submitting the nomination is 18.8.1999. For the
reasons beyond my control, I would not complete those works and I will not be
in a position to complete the aforesaid work on or before 18.8.1999.
Right
to contest the election is my fundamental right. I want to exercise that
fundamental right by contesting the ensuing Assembly Election. In view of
Sec.9A to the Representation of People Act, 1951, the existing contract between
me and the Government is causing me undue hardship and is coming in the way of
me contesting the ensuing assembly election. Having regard to various facts and
circumstances I have decided to request you to terminate all the existing
contracts subsist between me and the Government forthwith. Further, I request
you to cancel my registration as Class-I contractor with the department thereby
putting an end to any sort of subsisting contractual relationship between me
and the Government.
Further,
there are several contractors in Bidar District who are ready and willing to
undertake the said work and complete the same on the same rates and conditions
which is given to me in the subsisting contract between me and the Government.
Therefore,
I humbly request you to terminate all the existing contract between me and the
Government in respect of various works referred to above and issue necessary
certificate declaring that there is no subsisting relationship between me and
the Government forthwith. I humbly request you to entrust the work to other
Class-I Contractor of Bidar District who are ready and willing to undertake the
work on the same rates, terms and conditions. It is needless to state the last
date for filing nomination is 18.8.1999. Therefore, I humbly request you to
take the decision at the earliest and allow me to exercise my fundamental right
to contest the election in the ensuing assembly election of 1999 and oblige.
Thanking
you, Yours faithfully, Sd/- (Prakash Khandre)" Copy of letter dated
6.8.1999 (Ex.P-39) To Chief Engineer Communication & Buildings (South)
Bangalore.
Sub:
Requesting to cancel registration of Class-I Contractor in the Karnataka Public
Works Department-Reg.
Ref:
Registration No.65 date: 5.4.1995.
Related
to the above subject, I am willing to contest 1999 State Assembly Elections, I
am a Registered Class-I Contractor of the Karnataka Public Works Department and
now I am contesting in the forthcoming Election as a Candidate.
Therefore,
I pray you to cancel my registration.
Thanking
you, Yours faithfully, Sd/- (Prakash Khandre)" Copy of letter dated
6.8.1999 (Ex.P-61) GOVERNMENT OF KARNATAKA No.Lo.E: LEVI:99-2000: 1165.
OFFICE
OF THE EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT BIDAR, BIDAR DIVISION.
Dated:
6.8.1999 To Superintending Engineer Public Works Department Gulbarga Circle Gulbarga.
Respected
Sir, Subject: Regarding the issue of No Due Certificate to Sri Prakash Khandre,
Class-I, Contractor Bhalki.
Ref.:
(1) Letter of Sri Prakash Khandre dated 4.8.99.
(2)
Letter of Sri Prakash Khandre dated 4.8.99.
(3)
Letter of Sri Mallikarjun Khandre dated 4.8.99.
In
respect to the above subject, Sri Prakash Khandre Class I Contractor, Bhalki in
his letter Ref. No.1 has requested to close his all works as in the present
stage which comes in this division and also requested to issue No Due
Certificate and to cancel his Registration of Contractor and also sought
permission to retire from the Firm namely "C. Saraswathi & Sons"
because he is willing to contest the Forthcoming Assembly Elections as a
Candidate.
In
Ref. No.2, Sri Prakash Khande requested as in the First Letter to close all
works entrusted to him and to transfer the incomplete works in the Sri Mallikarjun
Khandre, Class-I Contractor. Contractor Licence of Mallikarjun Khandre is
enclosed.
Hot
Mix Plant, Paver and Road Roller and ready to do the incomplete works of Sri Prakash
Khandre in the same rates quoted and on the same Tender clause of Sri Prakash Khandre
and regarding to this he is ready to submit the Affidavit of the Court.
Present
Tender Works in the name of Sri Prakash Khandre.
Sl.
No. Details of the Works. Progress Stage.
1. Impts.
Halbarga Bawgi-Kamthana Road 90% of the work is (under NABARD Works) completed.
2. Halbarga
Junior College Building Work is completed
3. Impts.
Dhannura Pati to Chandapur Rd. Work is under Progress.
4. Dadgi
to Muchlum (HKDB). Work is under Progress.
5. Bhalki
to Humnabad Road. Work is completed
6. Bhalki
to Neelanga road. Work is completed Therefore, the above matter is sent to kind
attention and requesting to give directions. The matter is related to the
coming election, hence the order and the directions are expected soon.
Yours
faithfully, Sd/- 5.8.99 Executive Engineer PWD Division Bidar.
1.
Copy submitted for the kind information of Chief Engineer.Communication and
Buildings (North), Dharwad.
Copy
of letter dated 7.8.1999 (Ex.P-40) No.CBS: 65:RCT:CSB:99 OFFICE OF THE CHIEF
ENGINEER Communication & Buildings (South) Bangalore. Date 7.8.99 To
1. All
the Chief Engineers (All Projects) 2. Chief Engineer, National Highways,
Bangalore.
3. All
the Superintending Engineers (All Projects).
4.
Superintending Engineer, National Highway Circle, Dharwad.
5. All
the Executive Engineers, PWD and Irrigation Departments.
6.
Executive Engineer, Zilla Panchayat Engineering Division.
Respected
Sir, Subject: Regarding the application of Sri Prakash Khandre, Class-I
Contractor to Cancel his Registration of Class-I contractor, to contest the forthcoming
Assembly elections.
Ref:
Request letter of Sri Prakash Khandre, Class-I Contractor dated 6.8.1999.
Sri Prakash
Khandre, Class-I Contractor, Bhalki, Bidar district has given a requisition to
cancel his Registration of Class I Contractor because he is willing to contest
the forthcoming assembly elections. His registration no. being CBS:65 Civil95
dated 5.4.95 (for the period of 1995-2000).
Therefore
submit the details regarding the incompleted works and any dues to come to the
Govt. This is a election matter hence give personal attention and send the
reply in the next post. If any dues to come from contractor to Govt., send it
within 16.8.99 to this office. If any reports showing the dues are sent after
the above mentioned date are not considered and the concerned Executive
Engineer and the Account Superintendent will be held responsible.
Yours
faithfully, Sd/- Chief Engineer Communication & Buildings (South)
Bangalore.
Amshi:7899.
Copy
of letter dated 9.8.1999 (Ex.P-68a) Government of Karnataka (Public Works
Department) No./PWD/BDR/AC-1/99-2000/ OFFICE OF THE EXECUTIVE ENGINEER Bidar Divn.,
Bidar.
Dated:9.8.99.
To The
Superintending Engineer PWD Gulbarga Circle Gulbarga.
Sir,
Sub: Closing of PWD Works and issue of No Due Certificate-regarding.
Ref: 1.
Application of Sri Prakash Khandre, PWD Contractor Bhalki dtd. 4.8.1999.
2.
Chief Engineer, C&B (North
Dharwar ltr. No.CBS/65
RCT/CSB/99 dtd.7.8.99.
Anent
to the above it is to be stated that statement showing the works entrusted to
Sri Prakash Khandre, PWD Class I, Contractor, Bhalki on tender basis is
submitted herewith showing the details of estimated amount physical and
financial progress and balance of the works.
The
above works entrusted to the agency are in progress as the agency is capable to
completing the work. The completion of work may take some more time. In the
meanwhile, he has requested to close his works and issue no due certificates,
as intends to contest for ensuing Assembly Election.
Further,
Sri Mallikarjun Khandre, PWD Class I Contractor has given his consent letter
dated 4.8.1999 with the copy of his Registration for Class I Contractor to
execute the works and completion of the balance work at the rates quoted by Sri
Prakash Khandre, Class-I Contractor and terms & conditions of the agreement
and also to pay any Govt. dues outstanding against the above agency.
Therefore,
it is requested to accord permission for closing the works entrusted to Sri Prakash
Khandre, Contractor and to rescind the contract on his request. Sri Mallikarjun
Khandre, PWD Class I Contractor has given his consent to execute the balance
works at the agreed rates by Sri Prakash Khandre.
Therefore,
in view of the above, as a special case, permission may also be given to
entrust the balance works to Sri Mallikarjun Khandre, Contractor on Form
No.PWG-65 i.e.
piece
work entrusted Agreement system at the agreed rates by Sri Prakash Khandre, in
order to complete the work as scheduled. Thus there will be no loss to the
Government.
Early
orders are requested in the matter.
Yours
faithfully, Sd/- Exe. Engineer, PWD, Bidar Divn., Bidar.
1)
Copy submitted to the Chief Engineer (C&B) North, Dharwad, alongwith the
statement for favour of kind information and needful action in the matter.
Sd/-
Executive Engineer, PWD Bidar Divn., Bidar.
Copy
of letter dated 11.8.1999 GOVT. OF KARNATAKA (PUBLIC WORKS DEPARTMENT)
No.CE:Tha.Sa/4:99-2000/4908 OFFICE OF THE CHIEF ENGINEER Communication and
Buildings (North) DHARWAD.
Dated:
11th August, 1999.
Chief
Engineer Communication & Buildings (South) Bangalore Respected Sir, Sub:
Regarding the application of Sri Prakash Khandre, Class-I Contractor to Cancel
his Registration of Class I contractor, to contest the forthcoming Assembly
elections.
Ref:
(1) CE (C&B) South, Bangalore, letter no.CBS:65:RCT: CCB:99 dated 7.8.99.
(2)
Letter No. AAGu : C-5: BeBaaKi :
PramanaPathra
: 99-2000:2514:12, dated 10.8.99 of Superintending Engineer, PWD Gulbarga
Circle, Gulbarga.
Sri Prakash
Khandre, Class I Contractor, Bhalki is willing to contest the forthcoming
Assembly Elections therefore requested to cancel his Contractor Registration.
Superintending
Engineer has submitted the details regarding this in his letter (Ref. No.2).
Sri Prakash Khandre, Contractor has submitted the Affidavit along with the
letter of Sri Mallikarjun Khandre, PWD, Class I Contractor regarding the
completion of the incomplete work of Sri Prakash Khandre. Mallikarjun Khandre
himself has submitted the affidavit to take over the works entrusted to Prakash
Khandre in the old rates and stated to take full responsibility. Sri Prakash Khandre
also submitted the affidavit stating that in case if Mallikarjun Khandre fails
to complete the works, he will take responsibilities to get it completed. On
the basis of the affidavit this proposal may be accepted.
Therefore
as explained above, PWD, C&B (North) has no objection to cancel the Class I
Contractor Registration of Sri Prakash Khandre.
Yours
faithfully, Sd/- Chief Engineer Comm. & Buildings (North) Dharwad.
Copy
of letter dated 12.8.1999 (Ex.P27) Government of Karnataka (Irrigation
Department) No.SEB:IPCC/AE-2/76Km.RBC/99-2000 Office of the Superintending
Engineer, ID., IPC Circle, Bidar.
Dated:12.8.1999.
To The
Executive Engineer, ID KPC Divn. No.2 Bhalki.
Sir,
Sub: Providing & Fixing SS/CC Lining from Ch:75000 to 76000m in Km.76 of
RBC of Karanja Project.
Ref:
Chief Engineer, IPZ, Gulbarga Phonogram confirmation Ltr.
No.CEG/IPZ/KR/TA-2/A-E-2/ Km.76/lining/RBC/99-2000/2202 dated 13.8.1999.
Please
refer the above cited letter Originally addressed to this Office as well as
your office you are hereby directed to close the contract of Sri Prakash Khandre
duly observing Codal rules as per Tender clause as instructed by Chief Engineer
forthwith.
Yours
faithfully, Sd/- Superintending Engineer, I.D., IPC Circle, Bidar.
Copy
submitted to the Chief Engineer, ID, Irrigation Projects Zone, Gulbarga with
reference to Central Office letter No.2202 dated 13.8.1999.
Copy
of letter dated 16.8.1999 (Ex.P-53) No.CBS:66:RCO:CSB:99.
Office
of the Chief Engineer Communication and Buildings (S) Bangalore, dated
16.8.1999.
MEMORANDUM
Sub: Regarding cancellation of Class-I Contractor registration of Sri Prakash Khandre.
Ref:
1. The request of Sri Prakash Khandre dated 6.8.99.
2. The
letter of Chief Engineer, Communication & Building (N) Dharwad vide No.CE:N:SS-1:99-
2000-4908 dtd.11.8.99.
3.
Letter of Chief Engineer, Raichur Division vide No.ESH:TAS:REG:MIS99-2000 dated
13.8.1999.
PREAMBLE:
Sri Prakash
Khandre, Class-I Contractor, Balki, Bidar district has submitted an application
to this office on 6.8.1999 requesting for cancellation of his Class I
Contractor Registration as he is willing to contest the ensuing Assembly
Elections. In this connection letters were sent to all the Chief Engineers and
the Executive Engineers to send reports pertaining to any dues or incomplete
projects of Government from Sri Prakash Khandre, the contractor, requesting
them to submit report before 16.8.1999 to this office. As per the reports
received till date, there are no dues from Sri Prakash Khandre to the
Government and the Chief Engineer and the Executive Engineer have recommended
for cancellation of Class-I Registration as per the above references referred
at No.(1) and (2). Based on the recommendations, the Registration of Sri Prakash
Khandre, Class-I Contractor can be cancelled.
ORDER:
The
Registration of Class-I Contractor of Sri Prakash Khandre, Bhalki Bidar
district vide Ref. No.CBS:65:Civil:95 dated 6.4.95 is cancelled with immediate
effect and it is also certified that there is no dues from Sri Prakash Khandre
pertaining to any projects to the Government.
Sd/-
(B. SRINIVAS) Chief Engineer Communication and Buildings (South), Bangalore.
Copy
of letter dated 29.8.1999 (Ex.P8) Government of Karnataka (P.W.D.)
No.EE/PWD/BDR/TS.1/99-2000 Office of the Executive Engineer, PWD, Bidar Divn., Bidar.
Dated:29.8.1999.
To The
Asst. Executive Engineer, PWD, Sub-Divn., Bhalki/Bidar.
Sub:
Closing measurement of Prakash Khandre, Contractor Works-Reg.
Ref:
CE/office letter No.CE/North/Dharwad/TS.4/99- 2000/4108 dt.11.8.99.
Sir,
With reference to the above subject you are hereby directed that the
registration of Prakash Khandre, Class-I Contractorship has cancelled, so the
following works should be closed and closing measurements will be recorded and
intimate to this office.
1. Impts.
To Halbarge, Bowgi to Kemthane Road Km.0/0 to 34/40.
2. Impts.
To Dhanurapati to Chandapur Km.4/0 to 9/50 in Bhalki Tq.
Yours
faithfully, Sd/- Sd/- Received Executive Engineer, PWD, Bidar Divn., Bidar.
Copy
to Sri Prakash Khandre, Class-I, PWD, Contractor, R/original Bhalki Tq. for
information.
Sd/-
Executive Engineer, PWD, Bidar Divn., Bidar." From the correspondence
stated above, it can be held as under:-
1. On
4th, the appellant requested the Executive Engineer (a) to finalise the works
which were entrusted to him even if the works were incomplete as per the Rules.
(b) to
issue 'No Dues Certificate' and (c) to cancel his registration of contractorship.
2. On
6th August, he wrote similar letter to the Chief Engineer specifically requesting
him to do the needful forthwith for termination of all existing contracts and
to put an end to any sort of subsisting contractual relationship between him
and the Government. Again, he reiterated to terminate all existing contracts
and to issue necessary certificate declaring that there existed no subsisting
relationship between him and the Government.
3. On
the same date, he wrote letter to the Chief Engineer, Communication and
Buildings (South) Bangalore to cancel his registration.
4. On
6th itself, the Chief Engineer wrote letter to the Superintending Engineer for
taking necessary immediate action as prayed for by the appellant as the matter
related to the coming election and the copy was also submitted to the Chief
Engineer, Communication and Buildings (North) Dharwad.
5. On
7th August, the Chief Engineer, Communication and Buildings (South), wrote
letters to all Chief Engineers (All Projects), Chief Engineer, National
Highways, Bangalore, Superintending Engineers (All Projects), all Executive
Engineers, PWD and Irrigation Departments, Executive Engineer, Zilla Panchayat
Engineering Division for cancellation of Prakash Khandre's registration of
Class I contractor as he was to contest the forthcoming assembly elections and
to communicate any reports showing the dues, if any, with a specific statement.
It was also stated that if any reports showing the dues are sent after 16th
August, the concerned Executive Engineer and the Account Superintendent would
be held responsible.
6. On
9th August, Executive Engineer, Bidar Division wrote letter to the
Superintending Engineer, Gulbarga Circle that Prakash Khandre has requested to
close his work and issue 'No due certificate' and certificate of cancellation
of registration as he wanted to contest the ensuing assembly elections.
Therefore, permission was sought for closing the works entrusted to Prakash Khandre
and that Mallikarjun Khandre, Class-I contractor had given his consent to
execute the work at the rate agreed by Prakash Khandre. Therefore, as a special
case, permission was sought to entrust the balance work to Shri Mallikarjun Khandre
as it would not cause any loss to the Government.
7. On
11th August, 1999, Chief Engineer, Communication and Buildings (North) Dharwad
wrote letter to the Chief Engineer, Communication and Buildings (South)
Bangalore stating that Prakash Khandre (Contractor) has submitted affidavit
along with the letter of Sri.
Mallikarjun
Khandre that regarding completion of the incomplete work, Mallikarjun Khandre
would complete the same and Prakash Khandre has also submitted affidavit
stating that in case if Mallikarjun Khandre fails to complete the work, he will
take responsibility to get it completed.
8. On
12th August, Superintending Engineer directed the Executive Engineer to close
the contract of Shri Prakash Khandre as instructed by the Chief Engineer.
9.
Finally on 16th August, Chief Engineer, issued a memorandum Ex.53 that
registration of Prakash Khandre was cancelled with immediate effect and it was
certified that there were no dues pertaining to any project to the Government.
For this purpose, relevant correspondence is referred to in Ex.52.
10. On
29th August, the Executive Engineer, PWD, Bidar Divn., Bidar directed the Asstt.
Executive Engineer, PWD, Sub-Divn., Bhalki/Bidar that as the registration of Prakash
Khandre Class-I contractor is cancelled, the works of Halbarge-Bawgi to Kemthane
Road and Dhanurapati to Chandapur in Bhalki Tq. should be closed and closing
measurements of the work executed be recorded and the same may be intimated to
the office.
This
correspondence manifestly establishes that appellant terminated all his
contracts with the State Government as he was to contest election and the same
was accepted by the Department and the Chief Engineer issued 'No Dues Certificate'
and also cancelled his registration as Class I Contractor.
ORAL
EVIDENCE: - To the
same effect all witnesses of the Department examined by the Election-petitioner
have deposed before the Court. This would be clear from the evidence discussed
below.
Election
Petitioner examined PW2 B. Mallikarjuna, who was the Chief Engineer, Irrigation
Project. He was asked about the procedure for termination of subsisting
contract and to that, he replied the authority who entered into the contract is
also the authority for terminating the contract. He produced the entire file
containing the correspondence regarding cancellation of contract which was
marked as Ex.P9 and the file of Inspection Note Ex.P10. He carried out the
inspection on 8.11.1999 on account of closure of the work by the appellant in
order to issue further instructions to his subordinate officers to entrust the
same work to some other contractor. He had called for explanation from the
Superintending Engineer and the Executive Engineer regarding the work being
carried out after the termination of the contract in favour of the appellant.
He denied the suggestion that the work was being carried out by the appellant.
He has produced letter dated 12.8.1999 sent by the Superintending Engineer in
response to phonogram Ex.32. He has also stated that Executive Engineer had
sought permission from him for entrustment of work to Mallikarjun Khandre but
the permission was not granted.
He has
also denied the suggestion that he has manipulated the record in order to help
the appellant. The learned Judge has noted that after the evidence was read
over to the witness, he pointed out that when he made surprise inspection on
8.11.1999, he noted that Bed Concreeting had already been completed as stated
in Ex.28 and his statement that the work was in progress was not correct.
Other
witness PW8 N.L. Matry was working as Asstt. Executive Engineer at the relevant
time. He stated that he had accompanied the Chief Engineer on 8th November,
1999 for surprise inspection of the piece work from 75.750 to 75.810 km. He was
not in position to say who executed some portion of the work as observed by the
Chief Engineer in his report. However, he definitely stated that it was false
to suggest that the said work was carried out by Mr. Prakash Khandre and that
he was suppressing the said fact.
The
next witness PW4 Dinkar Rao, who was working as Superintending Engineer IPC
Circle, Bidar at the relevant time between July, 1998 to 5th October, 1999, has
stated that the appellant had given a representation to the Executive Engineer
requesting to issue no dues certificate. It is his say that he had sought the
opinion of the Government Pleader regarding premature termination of the
contract and on receipt of the said opinion, the same was forwarded to the
Chief Engineer.
Other
witness is PW5 S.K. Desai, who was working as Executive Engineer, KPC Division
No.2, Bhalki from 6.3.1999 to 8.8.2000. He was shown Ex.P22a letter dated
10.8.1999 given by the appellant to him to close the work entrusted to him and
to issue a no dues certificate at the earliest. It is his say that he also
received another letter from the appellant enclosing the necessary affidavit in
prescribed proforma to close his tender work which was produced at Ex.P23. Both
these exhibits were endorsed by him on 10.8.1999 and the necessary entries were
made in inward and outward register maintained by their office. He has also
produced letter dated 9.8.1999 written by him to the Chief Engineer, Zone
South, Bangalore which is Ex.P24 along with the no dues certificate. 'No dues
certificate' was given after getting clearance from account section. He has
stated that it was false to suggest that appellant himself had executed the
work and he was suppressing the truth from the Court. He admits that he has
written letter dated 12.8.1999 (Ex.27) to the appellant informing that the
tender for the work was closed. It is his say that even though the appellant
requested to entrust remaining work to his brother Mallikarjun Khandre, the
Central Office did not accede to his request.
PW7 Ashok
Kumar Mogsheety was working as a Junior Engineer at the relevant time. He has
stated that the last measurement in respect of the work entrusted to the
appellant was taken on 10.8.1999 and it is his say that the entries of measurement
book Ex.34 were in his handwriting. He stated that the measurement book was
also signed by the Executive Engineer and that there was no further measurement
of work pertaining to Sri Prakash Khandre.
Next
witness PW9 K. Mallikarjunaiah who was working at the relevant time as the
Chief Engineer, North Zone, PWD (C&B), Dharwad, has stated that letter
dated 9.8.1999 sent by the Executive Engineer, PWD Bidar Division was
subsequently brought to his notice on 11.8.1999. Pursuant to the said letter,
he addressed letter dated 11.8.1999 Ex.P37 to Chief Engineer (C&B), South,
Bangalore. It is his say that he permitted the transfer of work from appellant
to his brother Sri Mallikarjun Khandre. It is his say that by Ex.P37, he had
informed the Chief Engineer, (C&B), South, Bangalore stating that he has no
objection for cancellation of the registration of the appellant.
With
regard to the transfer of contract work from one contractor to another, he
specifically stated that he had verified the Codal Rules and that he was
competent to grant the permission of transfer of work from one contractor to
another under special circumstances. During 1994 before the general elections,
the same procedure was adopted.
In
further cross-examination, he has stated that he had ordered the transfer of
contract work after 16.8.1999. On 16.8.1999, the registration of contractorship
of appellant was cancelled.
PW10
B. Srinivasa who was working as Engineer-in-Chief has stated that at the
relevant time he was working as Chief Engineer PWD (C&B) South, Bangalore.
It is his say that his office received a letter dated 6.8.1999 Ex.P39
requesting for cancellation of registration of appellant. Pursuant to that
letter, he sought for sending No Dues Certificate from all the Chief Engineers,
Superintending Engineers etc. as mentioned in his letter dated 7.8.1999 Ex.P40.
On 16.8.1999 he passed the orders cancelling the registration of the appellant
after obtaining necessary information from Chief Engineer and Superintending
Engineers and others. He has denied the suggestion that the order of
cancellation of registration was manipulated. It is his further say that as per
the portion of Ex.52 (c), he passed the order Ex.P52(e) terminating all the
contracts of the appellant. Ex.52 order was issued on 16.8.1999 to the
appellant.
PW11 Basavraj
Kukunda who was working as a Superintending Engineer has produced
correspondence file of one inward and one outward registers for the month of
August onwards which were Exhibited as Ex. P 56, Ex. P. 57 and Ex. P 58. He has
stated that on the basis of information given by the Executive Engineer, Ex. P.
59, he had sent a letter dated 10th August, 1999 to the Chief Engineer
recommending cancellation of the registration of the contract of appellant and
to entrust the same work to his brother Mallikarjun Khandre. That letter is
produced as Ex. P60. It is his say that during the 1994 elections pending work
of a contesting candidate for the general elections was transferred in favour
of another contractor and on the basis of the same analogy, the contract of the
appellant was cancelled and the same was recommended to be transferred to his
brother Mallikarjuna Khandre. He agreed to the suggestion that baring the
precedence stated above, the Codal Rules of PWD do not authorise or empower him
to transfer the work.
PW12
V.S. Pathange, Executive Engineer has admitted that after cancellation of the
contract work in favour of the appellant the balance work was entrusted to his
brother Sri Mallikarjun Khandre.
He has
also stated that contract comes to an end when the registration of the contract
is cancelled. He has denied the suggestion that even though the contract was
transferred in the name of Mallikarjun Khandre, the same has been carried out benami
by the appellant. He admitted that he has entrusted the work to Mallikarjun Khandre
on 1.9.1999 and has sent the original Ex. 71 and 72 in his office at Bidar and
the entrustment of the work under the aforesaid Exhibits was on the direction
of the higher authority. Such directions were given to him in writing which was
Ex. P. 20. He has also produced agreement Form PWG 65. He denied the suggestion
that work was done by Mallikarjun Khandre for the appellant. It is his say that
in the month of September 1999, a different proforma was prescribed which was
Ex.115 and because of the oversight he might have earlier stated the agency as Prakash
Khandre for the months of October to December 1999.
PW16 Raj
Kumar Wadde who was working as Jr. Engineer, Bhalki Sub-Division has stated
that nobody has done the work of Halburga-Bawgi road during August, 1999.
Regarding stopping of work by Prakash Khandre, he made entry in Ex.P103.
Thereafter, further work which was carried out by Mallikarjun Khandre was also
entered in Ex.P103. It is his say that writing of name of Prakash Khandre at
Page no.56 Ex.P103 was a mistake and, therefore, the same was struck-off and in
his place Mallikarjun Khandre's name was written. He further stated that from
the month of September to December, 1999 no work was carried out on Halburga-Bawgi
roads.
PW17
Chandrasekhar Patil who was working as Assistant Executive Engineer has also
stated that he was inspecting the progress of work of Halburga-Bawgi road
between 4th August, 1999 to 30th August, 1999 and during that period he had not
seen any progress in the work. He had received the letter from the Executive
Engineer on 29th August, 1999 to take the closing measurement of the said work.
After
taking the measurement of 30th August, 1999, he submitted it to the Divisional
Office at Bidar.
From
the aforesaid oral evidence, it is abundantly clear that contract of asphalting
of Halburga-Bawgi Kamtana road was cancelled and the work was handed over to Mallikarjun
Khandre.
PW10
Engineer-in-Chief who was working as Chief Engineer, PWD, South Zone, Bangalore
has specifically stated that registration and cancellation of contractors
falling in Class-I and II is to be made by the Chief Engineer Communication and
Building (South), Bangalore and the power to remove from approved list of the
contractors is vested in him under Rule 12. After getting information from all
offices, he issued no dues certificate and cancelled the registration of the
appellant on 16th August, 1999. The contracts were terminated after obtaining
the opinion of the Government Pleader regarding pre- mature termination of the
contracts. PW2 Chief Engineer carried out inspection on 8.11.1999 because of
the closure of the work by the appellant. He denied that work was carried out
by Prakash Khandre after termination of the work. No dues certificate was also
issued after getting clearance from all the departments including the accounts
section. The last measurement with regard to the work executed by Prakash Khandre
was taken on 10.8.1999, as stated by PW7 Ashok Kumar. PW9 Chief Engineer has
also stated that he had permitted the transfer of work from appellant to his
brother Mallikarjun Khandre after verifying Codal Rules and that he had ordered
transfer of contract work after 16.8.1999. The work was entrusted to Mallikarjun
Khandre on the recommendation of Superintending Engineering, PW11. It is also
stated that contracts come to an end when the registration of contractorship is
cancelled. PW12 (Executive Engineer) denied the suggestion that even though the
contract was transferred in the name of Mallikarjun Khandre, the same was
carried out benami by the appellant.
From
the evidence and the correspondence produced between the appellant and the
Department, it is crystal clear that the appellant terminated the subsisting
contracts and the Department accepted it.
Hence,
contracts were brought to an end by the parties. Department also permitted the
remaining works to be carried out by Mallikarjun Khandre. In this view of the
matter, the finding given by the High Court that work of effective improvement
and asphalting of Halburga- Bawgi Kamtana road continued and, therefore,
contract was subsisting is erroneous.
The
question whether the contracts were subsisting or not is always a question of
fact to be determined from the evidence on record, still however, we would
refer to the relevant case law cited at the bar. In S. Munishamappa v. B. Venkatarayappa
and Others [(1981) 3 SCC 260], the Court considered letter written by a
candidate who was elected wherein he stated that "I cannot contest the
elections to Vidhan Sabha, therefore, I request you to immediately cancel the
work licence registered under you in my name. I request you to finalise all
works pending in my name and cancel my licence immediately." That was
processed by the Department and it was endorsed "please, finalise the
claims of the contractor for the above works". A further endorsement was
made directing the bills of the contractor to be submitted immediately. The
High Court arrived at the conclusion that on the relevant date the contract was
subsisting and, therefore, he was disqualified for contesting the election in
view of Section 9A of the Act. This Court considered the submission that
contract can come to an end
(1) by
parties,
(2) by
express agreement,
(3) under
the doctrine of frustration and
(4) by
breach; and after considering the letter Ex.17, the Court held thus: - "
The appellant makes it manifestly clear that he intended to contest the
election and to enable him to do so he wanted to have the licence in his favour
cancelled immediately and to have his bills settled. The said letter clearly
proceeds on the basis that at that point of time there was no existing contract
between him and the government and he was only asking for a settlement of his
bills and for cancellation of the licence. The endorsements made on the said
letter by the authorities also go to indicate that the said position is
accepted by them and necessary directions for finalisation of the bills are
given" With regard to the breach of contract, the Court further observed
as under: - "Even if it be held that the appellant had committed a breach
of the contract, the contract cannot be said to be subsisting thereafter. If
the contract is discharged by breach on the part of the appellant, the entire
contract necessarily goes and along with this the agreement, if there be any,
with regard to the maintenance, must necessarily go, leaving the party
aggrieved to take steps to recover damages for such breach. The contract,
however, cannot be said be subsisting. The fact that the bills of the appellant
were settled at a later date and that the security deposit was refunded later
on, will not disqualify the appellant in view of the explanation to Section 9-A
of the Act." The Court negatived the contention that if any contractor is
permitted to put an end to a contract by committing breaches thereof to enable
him to contest the election, will frustrate the very purpose of Section 9-A of
the Act by holding that whether a contract subsists or not, has to be determined
in the light of the provisions of law relating to contract and the
interpretation cannot be in any way different while considering the provisions
contained in Section 9-A of the Representation of the People Act.
Similarly
in Smt. Aslhing @ Lhingjanong v. L.S. John and Others [(1984) 1 SCC 205], the
Court considered the letter written by the contractor to the concerned
Executive Engineer stating that he was closing his contract, to be sufficient
for holding that the contract was no longer subsisting as the contractor
unilaterally put an end to the contract and informed the department concerned
accordingly and he had also resigned from the contractor's list of PWD. The
Court negatived the contention that unless the letter was accepted by the
authority, the contract would continue and the contractor would suffer from
disqualification by holding that acceptance of the letter by the authorities
was unnecessary for putting an end to the contract although, the breach may
give rise to a cause of action for damages.
Mr. Shanti
Bhushan, learned senior counsel heavily relied upon the affidavit dated
9.8.1999 sworn by appellant Prakash Khandre.
That
affidavit was sent along with a letter written by Mallikarjun Khandre who was
the substitute contractor for the appellant to the Executive Engineer stating
that he was willing to execute all the balance works entrusted to Shri Prakash Khandre
on his quoted rates as per agreement and to complete them in all respect. In
the said letter, it was further stated that he was prepared to pay any dues
outstanding against Shri Prakash Khandre. Along with letter there is an
affidavit of Prakash Khandre stating that in view of the preponement of the
assembly election, he could not complete the work and, therefore, he had
submitted application to terminate subsisting contracts between him and the
Government of Karnataka.
For
the remaining work, in his place, Sri Malikarjun Khandre Class-I Contractor has
agreed to execute the same on the same rate, terms and conditions.
We
would quote paragraph 7 of the said affidavit as heavy reliance is placed by
the learned senior counsel for contending that it would establish that contract
subsisted or there was novatio.
"Para 7. I hereby declare in case Sri Mallikarjun Khandre
Class-I Contractor, person fails to execute the work, I will take the full
responsibilities of getting it completed on the same rate and terms and
conditions." Firstly, from the aforesaid affidavit, it can be stated that
the appellant had terminated the contract and that there was no question of
subsisting contract. Further, statement made in the affidavit only indicates
that if Mallikarjun Khandre fails to execute the work, election petitioner will
take the full responsibility of getting it completed on the same rate, terms
and conditions. But the said statement would not mean that any new contract for
getting the works to be carried out was executed between the appellant and the
State Government.
Learned
senior counsel also relied upon the decision in Konappa Rudrappa Nadgouda v. Vishwanath
Reddy & Anr. (1969) 1 SCR 395] and submitted that in the present case also
there is condition to repair the work for a period of one year even after
completion of the contract work. It is his further submission that in view of
the paragraph 7 of the affidavit, appellant agreed to take over the
responsibility of completing the work if Mallikarjun Khandre failed to execute
the same and, therefore, there was a fresh contract between the appellant and
the Department. In the aforesaid case, the Court referred to Chatturbhuj Vithaldas
Jasani v. Moreshwar Parashram and others [(1954) SCR 817] wherein a contention
was raised that no longer any contract for supply of goods was in existence but
only an obligation arising under a guarantee clause subsisted and, therefore,
it cannot be held that contract was subsisting. The Court negatived the said
contention by holding thus:
"It
was argued that assuming that to be the case, then there were no longer any
contracts for the "supply of goods" in existence but only an
obligation arising under the guarantee clause. We are unable to accept such a
narrow construction. This term of the contract, whatever the parties may have
chosen to call it, was a term in a contract for the supply of goods. When a
contract consists of a number of terms and conditions, each condition does not
form a separate contract but is an item in the one contract of which it is a
part. The consideration for each condition in a case like this is the
consideration for the contract taken as a whole. It is not split up into
several considerations apportioned between each term separately. But quite
apart from that, the obligation, even under this term, was to supply fresh
stocks for these three depots in exchange for the stocks which were returned
and so even when regarded from that narrow angle it would be a contract for the
supply of goods. It is true they are replacements but a contract to replace
goods is still one for the supply of the goods which are sent as
replacements." The Court thereafter held that applying these observations
in the context of construction of buildings and roads, it is obvious that if
some part of the work is found defective and has to be re-done, the contract of
execution as such is still to be fully performed. This term of contract is part
of the contract of the execution because no execution can be said to be proper
or complete till it is properly executed. In such circumstances, the Court held
that the contract would subsist and, therefore, disqualification provided under
Section 9-A would apply.
In our
view, the aforesaid decision would have no bearing to the facts of the present
case. That case dealt with a situation where contract work was over, but the
time period as stipulated in the contract for carrying out the repairs was not
over. Therefore, it cannot be said that the contract was fully performed and
hence, it was subsisting. In the present case, there is termination of all
contracts by the appellant. The Department accepted such termination and the
contracts were brought to an end by both the parties. Therefore, there is no
question of contract or any part thereof subsisting on the date of scrutiny of
the nomination. This has been made clear in the first letter written by the
appellant on 6th August, 1999 to the Chief Engineer by stating that his
registration as Class I contractor with the Department be cancelled thereby
putting an end to any sort of subsisting contractual relationship between him
and the Government. Presuming that according to the terms of the contract if
some part of the contract work is found to be defective or is not properly
executed and the contractor was bound to perform the same during a period of
one year after completion of the contract, then also as contracts stood
terminated, said term of the contract of repairing for a period of one year of
curing the defect would also not subsist.
Learned
Senior Counsel Mr. Shanti Bhushan submitted that the contract work which was
given to the brother of the appellant was, as a matter of fact, performed on
behalf of the appellant by Mr. Mallikarjun, his brother and, therefore, the
High Court rightly held that contract was subsisting on the date of scrutiny of
the nomination paper. In our view, this submission is without any substance
mainly because after termination of the contract, fresh contract is executed by
Mallikarjun Khandre for carrying out remaining work. Further Section 7(d) as it
stood prior to its amendment in 1958 inter alia provided if the work is carried
out "by himself or for any person or body of persons in trust for him or
for his benefit or on his account", then such person was disqualified and
in such situation, the question of benamidar or carrying out on behalf of
appellant might require some consideration. After substitution of Section 7(d)
by Section 9A, there must be subsisting contract by the contesting candidate
for execution of any works undertaken by him with the Government. The essential
ingredient of the Section is that the contract for the execution of any works
undertaken by the Government should be subsisting on the date of scrutiny of
nomination. It is to be stated that because Mallikarjun Khandre is brother of
the contractor, it cannot be said that he was acting as a benamidar as he
himself was a registered Class-I contractor. Further, as stated above, the
objects and reasons of Section 9-A provides that an unduly strict view about
the government contract should not be taken as it might lead to
disqualification of large number of citizens, many of whom may prove to be able
or capable Members of Parliament or State Legislatures. Therefore, the amended
Section 9-A uses the phrase that a person shall be disqualified 'so long as
there subsists a contract'. Similarly, subsequent payment by the Government for
the work done which was payable at the time of termination of contract would
not mean that contract between the parties was subsisting and Explanation to
Section 9-A has made the position clear.
Learned
counsel further referred to Ex.105, which is a measurement book and submitted
that in the months of September, October, November and December 1999 also, the
name of contractor, Prakash Khandre continued and, therefore, it cannot be held
that contract was terminated. In our view, as stated above, all contracts with
the appellants stood terminated on 16th August, 1999.
Contractor's
registration was cancelled. No dues certificate was also given. Fresh contracts
with the firm of brother of appellant, Mallikarjun Khandre were executed. Mallikarjun
Khandre himself was a Class-I contractor. In these set of circumstances, it
would be totally unreasonable and unjustifiable to refer to some errors
committed by some officers as admitted by the witnesses, in mentioning the name
of Prakash Khandre as contractor in the measurement book to arrive at the
conclusion that contract between appellant and the Government was subsisting.
Further, as per letter dated 29.8.1999, the Executive Engineer directed the
Assistant Executive Engineer that the closing measurement of the work executed
be recorded and the same may be intimated to the office.
The
work included Halbarga-Bowgi road to Kamthane road.
Learned
counsel next referred to the Codal Rule 167 and contended that contract work
should not have been given to Mallikarjun Khandre and the Department was required
to follow the procedure prescribed thereunder. Codal Rule 167 reads as under: -
"167. (1) Contracts for works estimated to cost Rs.10,000/- and over
mentioned in sub-para 4 infra, should be prepared only on regular contract form
No. PWG 65 and should be invited by public tenders.
(2)
Sanctioned works falling under the following categories may be got executed on
piece-work system at rates not exceeding the current minimum schedule of rates
each case being however reported to government.
(a)
Works for which there have been no response from any of the contracts to the
Notification calling for tenders.
(b)
Works for which only individual tenders are received and which cannot be
accepted in view of the prohibitively high rates quoted which will not bear any
comparison with the sanctioned estimate rates or the current schedule of rates.
In the case of tendered contractors who stop away in the middle, action should
be immediately taken to cancel their contract, strictly enforcing the penal
clause of the contract, the balance of work being got done as above or as per
terms of contract.
In any
case, either the same tendered contractor or his agents should not be given the
balance work for execution." In our view, the Election Petitioner could
not challenge the acceptance or termination of contract and grant of contract
to Mallikarjun by the Department by resorting to certain departmental procedure
prescribed for grant of contract to other contractor. In any case, not
following the procedure prescribed under the Rules would hardly be a ground for
holding that the contract was subsisting. PW9, Chief Engineer, North Zone has
specifically stated that he had verified the Codal Rules and that he was
competent to grant permission of transfer of work from one contractor to another
under special circumstances and that similar procedure was adopted before
General Elections during 1994. Hence, presuming that he has wrongly interpreted
Codal Rule 167, then also it cannot be held that contract between the appellant
and the State Government was subsisting. In this view of the matter, in our
view, further evidence led by the parties is not required to be dealt with or
considered.
From
the aforesaid discussion, it is apparent that there was no contract subsisting
between the appellant and the State Government so as to apply the provisions of
Section 9-A of the Act and to hold that appellant was disqualified to contest
the elections. As stated above, the order passed by the High Court declaring
Dr. Vijay Kumar Khandre-respondent No.1 as elected is, on the face of it,
illegal.
In the
result, Civil Appeal Nos. 2-3 of 2002 filed by Prakash Khandre are allowed, the
impugned order passed by the High Court declaring election of Prakash Khandre,
the returned candidate, as void and declaring Dr. Vijaykumar Khandre who had
polled the next highest number of valid votes as elected from No.2 Bhalki
Legislative Assembly constituency to the Eleventh Karnataka Legislative
Assembly is quashed and set aside.
In
view of the order passed above, Civil Appeal No.1455 of 2002 stands dismissed.
There
shall be no order as to costs.
........J.
(M.B.
SHAH) ........J.
(BISHESHWAR
PRASAD SINGH) ........J.
(H.K.
SEMA) May 9, 2002.
Back