Parveen
Jindal & Ors Vs. State of Haryana & Ors [1993] INSC 129 (16 March 1993)
Jeevan
Reddy, B.P. (J) Jeevan Reddy, B.P. (J) Venkatachala N. (J)
CITATION:
1993 SCR (2) 353 1993 SCC Supl. (4) 70 JT 1993 (2) 311 1993 SCALE (2)20
ACT:
Haryana
Service of Engineers Class-I P.W.D. (Irrigation Branch) Rules, 1964: Rules
5(2), 7(2)--First proviso.
Haryana
Service of Engineers Class--II P.W.D. (Irrigation Branch) Rules, 1970:
Service
Law--Power of employer to fill up posts--Cadre--Strength of--Fired by Rules--But
posts not filled for a long time--Held where strength of cadre is fixed by
Rules--Government is not justified in not filling up the posts for a very long
time except for very strong and good reasons--Directions to State to fill up
the posts issued.
State
Public Service Commission--Power to notify vacancies--Commission has no
authority to notify vacancies wihout requisition from Government--Only
appointing authority viz. Government is competent to make requisition to
Commission.
Service
Law--Selection--Written test and interview--Prescription of qualifying marks
for interview--Obtaining of prescribed minimum marks does not create a right to
be called for interview--Commission can limit number of candidates to be called
for interview--Also mere appearance by candidate at selection does not clothe
them with right to selection.
HEAD NOTE:
The
Public Works Department of Government of Haryana consists of three wings viz.,
Irrigation, Roads and Buildings and The Engineering Service in the Irrigation
Branch comprises both Class-I service-consisting of Assistant Executive
Engineers, Executive Engineers and Superintending Engineers and Class-II
service including Assistant Engineers. While the Assistant Executive Engineers
are recruited by direct recruitment only, the Executive Engineers are recruited
by
(i) direct
recruitment;
(ii) by
transfer;
(iii) by
promotion from Class-II service.,
The
cadre strength of Assistant Engineers, fixed under tie Rules is very large 354
as compared to the cadre strength of Assistant Executive Engineers. For the
purposes of promotion to Executive Engineers both Assistant Executive Engineers
and Assistant Engineers are eligible for which inter-se quota is fixed under
the Rules.
The Haryana
Public Service Commission issued a notification in 1985 inviting applications
for selection to the posts of Assistant Executive Engineers for all the three
wings of the P.W.D. Although the requisition from the Government was to select
Assistant Executive Engineers only for two wings viz.
Public
Health and Buildings and Roads yet the Commission notified the vacancies with
respect to Irrigation Branch also stating that posts in the said category are
also likely to be filled from the suitable candidates from this very
advertisement after the receipt of demand from the Government. On the basis of
written test and interview selections were made for Public Health and Buildings
and Roads wings but no selections were made for the Irrigation wing because
even by the date of finalisation of selections, no requisition or demand had
come from the Government.
The
appellants, who were not selected, filed writ petitions in the Punjab and Haryana
High Court for a direction to respondents to fill up vacancies of Assistant
Executive Engineers and others falling to the quota of direct recruits from
amongst the applicants who had applied in pursuance to the advertisement and
for a further direction to the State of Haryana to send requisition to the
Commission to fill up all vacancies which are meant for direct recruits. The
High Court dimissed all the petitions.
In
appeals to this Court it was contended on behalf of the appellants that
(1) the
Government acted arbitrarily in not sending the requisition, inspite of the
fact that vacancies in Irrigation Branch existed for a number of years;
(2)
when the rules created a particular category and the cadre strength was also
fixed therefor and more particularly when a quota was reserved for them in the
channel of promotion to the category of Executive Engineers, it was not open to
the Government to nullify the spirit and object behind the Rules by refusing to
make appointment to the said category-,
(3)
the procedure adopted by the Haryana Public Service Com- mission was contrary
to Rules because under the Rules a candidate obtaining 50 per cent marks in the
written test is entitled to be called for viva voce, but the Commission
arbitrarily prescribed a threshold of 65 per 355 cent which resulted in denial
of opportunity of selection to the appellants.
The
stand taken by the Government of Haryana was that the decision not to send
requisition for filling up the vacant posts of Assistant Executive Engineers in
Irrigation Branch was bona fide and actuated by relevant considerations because
a large number of Assistant Engineers, who can be posted only as Sub Divisional
Officers/Sub Divisional En- gineers, are in surplus over and above the cadre
strength and if the Assistant Executive Engineers are also appointed as
demanded by the appellants, they will be in further surplus inasmuch as they
too can be posted only as Sub Divisional Officers/Sub Divisional Engineers.
Allowing
the appeals in part, this Court,
HELD:
1. The
Public service commission had no authority to include the vacancies in the
Irrigation Branch in the notification issued by it when the Government had not
asked for it. May be the Commission did so bona fide. Even so,, the fact
remains that none were selected against the vacancies in the Irrigation Branch,
evidently because no demand/requisition ever arrived from the Government.
Indeed,
it is not as if the appellants appeared only for the vacancies in Irrigation
Branch. It was a composite notification for all the three wings. The appellants
do not say that they confined their applications to Irrigation wing alone. nose
selected for the other two wings had admittedly scored more marks at the
selection. Therefore, the mere appearance at the selection does not clothe them
with the right to selection or appointment. [366G-H, 367A-C] State of Haryana
v. Subhash Chandra Marwaha, [1974] 3 S.C.C. 220 and LJ. Divakar v. Government
of Andhra Pradesh, A.I.R. 1982 S.C. 1555, relied on.
2.
Where the Rules have created a particular category, fixed its cadre strength
and have also prescribed a quota for such categroy in the matter of promotion
to the higher category, the Government would not be justified in not making
appointments to such category for over a decade unless there are very strong
and good reasons therefor. The Government would not be justified in nullifying
though not in word, but in spirit the Rules in this manner. [367C-D]
2.1.
There is no reason why the Government did not think it fit to 356 make some ad
hoc. appointments to the category of Assistant Executive Engineers when it was
recruiting such a large number, on ad hoc basis, to the category of Assistant
Engineers. At the same time, the Courts have to think twice before adding the
numbers to the already over-loaded service. It is not so much a question of
'punishing' the errant but one of what to do with the surplus personnel and the
consequent unwarranted burden upon the public exchequer.
On
balancing the contending rights and equities, the Court is of the opinion that
at least part of the cadre strength of Assistant Executive Engineers in the
Irrigation Branch should be riled up in the near future. [367E-G]
3. The
selection held in which the appellants had appeared, cannot be directed to be finalised.
The only direction that can properly be made herein is to direct the Government
to take steps for filling up the vacancies existing in the category of
Assistant Executive Engineers in the Irrigation Branch as early as possible. Atleast
half the vacancies therein should be filed within a period of one year from
today. [367H, 368A-B] I.J. Divakar v. Government of Andhra Pradesh, A.I.R. 1982
S.C. 1555, distinguished.
4. A
reading of the first proviso to Sub.Rule (2) of Rule 7 shows that it prescribes
a minimum percentage of marks in the written test both for appointment as well
as for being called for interview (viva voce). It does not create a right in
the candidate, who has obtained the prescribed percentage of marks, to be
called for interview. [363A] Ashok Kumar Yadav v. State of Haryana, A.I.R. 1987 S.C. 454, relied On. Umesh
Chandra v. Union of India, [1985] 3 S.C.C. 721; Nilima Shangla v. State of Haryana, [1986] 4 S.C.C. 268 and P.K Ramachandra
Iyer & Ors. etc. etc. v. Union of India & Ors., [1984] 2 S.C.C. 141,
referred to.
CIVIL
APPELLATE JURISDICTION: Civil Appeal Nos.3465-69 of 1988.
From
the Judgment and Order dated 26.10.1987 of the Punjab and Haryana High Court in C.W.P. Nos. 755, 5141 &
3659/87 & 3138/88.
357 Shanti
Bhushan and Prem Malhotra for the Appellants.
Ms. Nisha
Bagchi for Ms. Indu Malhotra, U.S. Chowdhary
and Ravindra Bana for the Respondents.
Bhal
Singh Malik and S.M. Hooda for the Intervenor.
The
Judgment of the Court was delivered by B.P. JEEVAN REDDY, J. This batch of
appeals is preferred against a common judgment of Punjab an Haryana High Court dismissing a
batch of six writ petitions.
There
are three wings/branches in the Public Works Department of the Government of Haryana,
viz., Irrigation, Roads and Buildings and Public Health. We are concerned
herein with the Irrigation branch. The Engineering service in the Irrigation
branch comprises both class-I, and class- II services. Recruitment to and
conditions of service of class-I are governed by the Haryana Service of
Engineers Class-I P.W.D., Irrigation Branch Rules, 1964 whereas recruitment to
and conditions of service of class-11 is governed by Haryana Service of
Engineers Class-11 P.W.D.
(Irrigation
Branch) Rules, 1970. The lowest category in class-I is that of Assistant
Executive Engineers. Above it is the category of Executive Engineers and above
it Superintending Engineers. Recruitment to the category of Assistant Executive
Engineers is only by direct recruitment.
Recruitment
to the category of Executive Engineers is (a) by direct recruitment, (b) by
transfer of an officer already in class-I service of the Government of India or
of a State Government and (c) by promotion from class-11 service. Sub- rule (2)
of Rule 5 of the class-I Rules says, "recruitment to the service shall be
so regulated that the number of posts filled by promotion from class-11 service
shall not exceed 75% of the number of posts in the service excluding the posts
of Assistant Executive Engineers for the first 10 years from the date of
commencement of these Rules and thereafter shall not exceed 50% of the number
of posts in the service excluding the post of Assistant Executive
Engineers." The proviso to this sub-rule, however, says that "in case
an adequate number of Assistant Executive Engineers who are eligible and
considered fit for promotion are not available the actual percentage of
officers promoted from class-11 service may be larger than 75% or 50%, as the
case may be." In other words, after the year 1974, the share of class-11
officers in the promotion quota to the category 358 of Executive Engineers categroy,
shall not exceed 50%, the balance being allocated to the Assistant Executive
Engineers who are also entitled to be promoted to the categroy of Executive
Engineers. But in case adequate number of Executive Engineers are not
available, the said ceiling can be exceeded.
Though
the Assistant Executive Engineers are in class-I and Assistant Engineers are in
Class-II, both these categories discharge similar functions, duties and
responsibilities.
Members
of both these categories are posted as Sub- Divisional Officers/Sub-Divisional Engieers.
Both are eligible for promotion to the category of Executive Engineers as
stated above, but while the cadre strength of Assistant Engineers is very
large, the cadre strength of Assistant Executive Engineers is quite small, with
the consequence that in the matter of promotion to the category of Executive
Engineers, the Assistant Executive Engineers enjoy a marked advantage in view
of the inter se quota prescribed by sub-rule (2) of Rule 5. The Assistant
Executive Engineers get promoted far sooner than the Assistant Engineers. The
cadre strength of Assistant Executive Engineers is stated to be 49. While the
cadre strength-of Assistant Engineers is not stated before us, it is admittedly
far larger.
In the
year 1985, the Haryana Public Service Commission issued a notification stating
that "a combined competitive examination for recruitment to the post of
Assistant Executive Engineers (C) in the P.W.D. will be held by the Haryana
Public Service Commission in August/September, 1985 in accordance with the
rules of Haryana P.W.D. Irrigation, B&R and Public Health Branches, as
amended from time to time." Then followed the table of particulars, which
must be noticed:
Reserved
Reserved Reserved Name Of Post No. Of For S.c.of For B.c. Post For Ex. Haryana Haryana
Service ---------------------------------------------------------- 1 2 3 4 5
----------------------------------------------------------
(i) Haryana
Service of Engineers 15 4 2 1 Class I (Junior Sca- les) in P.W.D. Public Health
Branch.
359
(ii) Haryana
Service of 8 2 1 enginners Class I Enginee- rs Class I (Junior Scales) in
P.W.D. B & R. Br.
-----------------------------------------------------------
(iii)Haryana
Service of Engineers Class I (Junior Scale) posts in the P.W.D.
Irrigation
Branch are also likely to be filled from the suitable candidates from this very
advertisement after the receipt of demand from the Government.
----------------------------------------------------------
2. The
number of posts given against each category is liable to variation. Three posts
(two for S.C.of Haryana and One B.C. of Haryana) in P.W.D. B & R Branch are
reserved failing with other shall be considered. Seven posts (four for S.C. of Haryana,
two for B.C. of Haryana and one for Ex- Servicemen) in P.W.D. Public Health
Branch are reserved failing whom others will be considered".
It is
significant to notice the wording of item (iii) in the table. It is clear therefrom
that the Public Service Commission had notified the vacancies in the category
of Assistant Executive Engineers (referred in the Rules and in the notification
as Engineers class-I (Junior Scale)) even without a requisition from the
Government. The-Commission by stating that posts in the said category "are
also likely to be filled from the suitable candidates from this very
advertisement after the receipt of demand from the Govern- ment", had made
it known to the candidates-of the absence of authority. Admittedly, no such
demand or requisition was ever received by the Government at any time after the
issuance of the said notification. It is equally relevant to point out that
under the notification, applications for selection to the category of Assistant
Executive Engineers in all the three wings of the P.W.D. were called for. The
eligibility criteria and the qualifications required for appointment to the
said category is stated to be indentical in all the three wings though they are
governed by different sets of rules. It is also stated before us that no
separate applications were necessary and that one could apply for appointment
in all or any of the three wings indicating his choice and subject to his
fulfilling the prescribed qualifications.
In
response to the notification aforesaid, several Engineers including 360 the
appellants herein applied. A written test was.
conducted
followed by an oral interview. On the basis of the marks obtained in the
written test and the oral interview, certain persons were selected for Public
Health and Buildings & Roads wings. No selections were made for the
Irrigation wing evidently for the reason that even by the date of finalisation
of selections, no requisition or demand had come from the Government. It is
only then that the appellants approached the Punjab and Haryana High Court with
a batch of writ petitions praying for the issuance of an appropriate writ,
order or direction to the respondents (Government of Haryana and the Haryana
Public Service Com- mission) "to fill up 44 vacancies of Assistant
Executive Engineers and others falling to the quota of direct recruits from
amongst the applicants who had applied in pursuance of the
advertisement........ They asked for a further direction to the State of Haryana
"to send requisition to the Respondent-Commission to fill up all the
vacancies in the Class-I service which are meant for direct recruits forthwith
and to make appointment to the class-I service by the method of direct recruits
as required by the Rules." The appellants challenged the method of
selection followed by the Commission as also the refusal/failure of the
Government to fill up the vacancies in the category of Assistant Executive
Engineers.
The
writ petitions were opposed by the Public Service Commission as also by the
State Government. The High Court dismissed the writ petitions rejecting the
several contentions urged by the appellants.
In
this appeal, Sri Shanti Bhushan, the learned counsel for the appellants urged
the following contentions:
(1)
The cadre strength of Assistant Executive Engineers in the Irrigation wing is
49. As against the said strength, there were only 5 persons holding the posts,
which means the vacancies are 44 in number. There has been no recruitment to
this category since 1979. In that year, the Government had sent a requisition
for 22 posts but only 8 were selected by the Commission. From out of these
eight, only five were appointed to the category. In the year 1983, the
Government sent a requisition to the Commission for 23 posts but none were
selected or appointed. It is in this situation that the notification issued by
the Commission in the year 1985 envisaged a selection to the category of
Assistant Executive Engineers in the Irrigation Branch as well. The Commission
expected that in view of the vacancies earlier notified, the Government would
be sending a requisition and with 361 a view to save time and effort, it
included the vacancies in Irrigation wing as well in the Notification, which
pertained to the vacancies in the very same category in the other two wings of
the P.W.D., for which requisition was received.
The
Government acted arbitrarily and unreasonably in no sending the requisition, inspite
of the fact that 44 vacancies have been existing in this category in Irrigation
Branch since a long number of years. This refusal to fill up the said vacancies
is mala fide and is designed to help and promote the interest of class-II
officers. Though, according to the Rules, the number of promotees from class-
11 in the category of Executive Engineers should not exceed 50%, the fact is
that practically all the promotion posts in the category of Executive Engineers
are held by erstwhile class-II officers for the reason that the category of
Assistant Executive Engineers in this branch is being kept practically empty.
When the statutory rules have created a particular category and a cadre
strength is also fixed therefor and more particularly when a quota is reserved
for them in the channel of promotion to the category of Executivie Engineers,
it is not open to the Government to nullify the spirit and object behind the
Rules by refusing to make appointment to the said category. If these 44 posts
are filled up, many of the appellants, if not all, are likely to be selected
and appointed.
(2)
The procedure adopted by the Haryana Public Service Commission is contrary to
statutory Rules. Whereas the Rules say that a candidate obtaining 50% marks in
the written test is entitled to be called for viva-voce, the Commission has
arbitrarily prescribed a threshold of 65% which it had no jurisdiction to do.
As a result of the said arbitrary stipultion several of the appellants have
been denied the opportunity of selection. The Commission must now be directed
to make selection afresh for all the three wings/branches in the Public Works
Department.
With a
view to clear the ground, it would be appropriate to deal with the second
contention first. It is based upon the proviso to sub-rule (2) of Rule 7 of the
1964 Rules. Rule 7 deals with direct appointment. For the sake of convenience,
we may set out sub-rules (1) and (2) of Rule 7:
"DIRECT
APPOINTMENT:- (1) A Candidate for direct appointment shall not be less than
20 years and more than 25 years on age of or before the first day of August
next precedin g the last date of submission of applications to the commission;
362
Provided that:- (a) in the case of candidates who are displaced persons and in
whose case the age limit for admission to Engineering College had been relaxed,
and in the case of candidates belonging to the Scheduled Castes, Scheduled
Tribes and other backward classes the upper age limit shall be such as may be
fixed by the Government from time to time.
(b) in
the case of candidates possessing the requisite qualifications who are already
in the service of the State Government, the upper age limit shall be 30 years;
(2)
The selection of candidates, including those belonging to Scheduled Castes,
Scheduled Tribes or Backward Classes, shall be made by the Commission, after
holding a competitive examination, the syllabus for which shall be such as may
be prescribed by the Government from time to time. The Commission shall
recommend the required number of candidates after arranging their names in the
order of merit and indicating which out of them belong to Scheduled Castes,
Scheduled Tribes or Backward Classes:
Provided
that a candidate shall not be considered qualified for appointment, unless he
obtains not less than forty per cent marks in each subject and also not less
than fifty per cent marks in the aggregate, and no candidate who does not
obtain the qualifying marks shall be called for interview by the commission.
Provided
further that where a vacancy has been reserved for a person belonging to
Scheduled Castes, Scheduled Tribes or Backward Classes, who secures the highest
marks in the aggregate and has qualified for an appointment shall be selected
irrespective of his position with respect to the other candidates." 363 A
reading of the first proviso to Sub-Rule (2) of Rule 7 shows that it prescribes
a minimum percentage of marks in the written test hoth for appointment as well
as for being called for interview (viva voce). It does not create a right in
the candidate, who has obtained the prescribed percentage of marks, to be
called for interview. This is how a similar Rule has been understood by a
Constitution Bench of this Court in Ashok Kumer Yadav v. State of Haryana,
A.I.R. 1987 S.C. 454. Regulation 3 in the Appendix to the Haryana Civil Service
(Executive) and other allied services read as follows:
"3.
No candidate shall be eligible to appear in the viva voce test unless he
obtains 45 per cent marks. in the aggregate of all subjects including at least
33 per cent marks in each of the language papers in Hindi (in Devanagri Script)
and Hindi Essay provided that if at any examination a sufficient number of
candidates do no obtain 45 per cent marks in the aggregate the Commission may
at their discretion lower this percentage to not below 40 per cent for the
language papers remaining unchanged." Construing the said Regulation, the
Court held:
"it
is clear on a plain natural construction of Regulation 3 that what is
prescribes is merely a minimum qualification for eligibility to appear at the
viva voce test. Every can- didate to be eligible for appearing at the viva voce
test must obtain at least 45 per cent marks in the aggregate in the written
examination. But obtaining of minimum 45 per cent marks does not by itself
entitle a candidate to insist that he should be called for the viva voce test
all candidates who satisfy the minimum eligibility requirement.
It is
open to the Harvana Public Service Commission to say that out of the candidates
who satisfy the eligibility criterion of minimum 45 per cent marks in the
written examination, only a limited number of candidates at the top of the list
shall be called for interview. And this has necessarily to be done because
otherwise the viva voce test would be reduced to a farce.
It is
indeed difficult to- see how a viva voce test for properly and satisfactorily
measuring the personality of a candidate can be carried out, if 364 over 1300
candidates are to be interviewed for recruitment to a service. If a viva voce
test is to be carried out in a thorough and scientific manner as it must be in order
arrive at a fair and satisfactory evaluation of the personality of a candidate,
the interview must take anything between 10 to 30 minutes." In view of
this decision, we do not think it necessary to deal wit the decisions cited by
Sri Shanti Bhushan, namely, Umesh Chandra v. Union of India, [1985] 3 S.C.C.
721; Nilima Shangla v. State of Haryana, [1986] 4 S.C.C. 268 and P.K Ramachandra
Iyer & Ors. etc. etc. v. Union of India & Ors., [1984] 2 S.C.C. 141.
Suffice it to say that neither of them lays down any principle contrary to the
one quoted above from Ashok Kumar Yadav.
Coming
to the first submission of Sri Shanti Bhushan, the defence of the Government is
to the following effect:
"It
is also admitted. that cadre strength of Assistant Executive Engineer was fixed
on 22.1.82 and is 49 out of which 5 persons are in position. However, at
present, there is no vacant post of Assistant Executive Engineer in the
Department. The true facts are that during the year 197980 some major projects
viz. Drainage Projects, Jawahar Lal Nehru Project and Linning etc. under the
World Bank Schemes were taken into hand and there was immediate requirements of
technical staff.
For
this purpose and to take up the time bound works, 212 Assistant Engineers were
recruited on adhoc basis and 178 Sub Divisional Officers were promoted from
Junior Engineers/Draftsmen etc. on adhoc basis to meet the immediate requirement
during the aforesaid period till their replacement by the joining of regular
Assistant Engineers through Haryana Public Service Commission. The Haryana
Public Service Commission recommended 176 number of Assistant Engineers in
December, 1981 for regular appointment against the posts of those, who were
appointed/ promoted as Assistant Engineer/Sub Divisional Officers on adhoc
basis. They were given offer of appointment on 29.1.1982.On joining of regular
Assistant Engineers, the 365 services of about 45 adhoc Assistant Engineers
were terminated by the Government.
The adhoc
Assistant Engineers whose services were terminated by the Government filed
Civil Writ Petition No. 1529/89 Amarjeet Singh and others v. State of Haryana
and other, writs involving the same cause of action challenging their
termination orders. Upon regular hearing the above Civil Writ Petition, the
Punjab and Haryana High Court (Hon'ble Justice Mr. I.S. Tiwana) in its orders
dated 3.9.84 decided the matter in favour of the adhoc Assistant Engineers
recruited during the year 1980. Thus the services of adhoc Assistant Engineers
could not be terminated and they continued to hold the posts of Assistant
Engineers, till date. However, Government have filed Letter Patent Appeal
No.186-90 of 1985 and 374-381 of 1985.Amarjeet Singh etc. v. State and the same
is pending for decision in the Hon'ble Punjab and Haryana High Court.
Similarly, the Sub Divisional Officers, who are promoted on adhoc basis in the
year 1979-80 in excess of their quota could not be reverted by the Government
for want of finalisation of Ranking List for the purpose of promotion to the
post of Sub- Divional Officers in pursuance of the directio n given by the Hon'ble
Punjab and Haryana High Court in Civil Writ Petition No. 5630-5631 of 1981. J.P.
Gupta and Shri Krishan v. State, 1524/76 M.L. Verma v. State and 4489/82 Shri
R.K Jain v. State." The learned counsel appearing for the Government of Haryana
explains that 176 Assistant Engineers selected by the Commission in December,
1981 for regular appointment are 'in addition to 390 Officers (212 Assistant
Engineers recruited on adhoc basis and 178 Sub Divisional Officers promoted
from the category of Junior Engineers/Draftsment etc. on adhoc basis). This
statement is, however, disputed by learned counsel for the appellants. Be that
as it may, the submission of the learned counsel for the Government of Haryana
is this: both the Assistant Engineers and Assistant Executive Engineers are
posted as Sub-Divisional Officers/Sub-Divisional Engineers. There is no other
posting available for them. In the circumstances explained in the
counter-affidavit, a large number of Assistant Engineers are in surplus over
and above the cadre strength.
They
have to be posted some- 366 where and they can be posted only as Sub Divisional
Officers/ Sub.Divisional Engineers. If Assistant Executive Engineers are also
appointed as demanded by the appellants, they will be in further surplus
inasmuch as they too can be posted only as Sub Divisional Officers/Sub Divisional
Engineers and there are no posts available to post them.
The
Government is finding it difficult to give postings to the already existing
Assistant Engineers, who have been recruited/promoted on adhoc basis as stated
above and who could not be ousted because of the orders from courts. It is for
this reason that the Government did not send requisition for filling up the 44
posts of Assistant Executive Engineers in Irrigation" Branch. The said
decision is a bona fide decision actuated by relevant considerations. There are
absolutely no mala fides on the part of the Government in not filling up the
said posts of Assistant Executive Engineers. It is also brought to our notice
that though a requisition was sent to the Commission in the year 1983 for 23
posts of Assistant Executive Engineers in the Irrigation Branch, the Government
had withdrawn the said requisition on May 20, 1983 itself i.e., even before any
selection could be made. It was for this reason that no one was selected or
appointed to the said category in that year. Counsel submitted, supported by
the counsel for the Commission, that in these circumstances, the Commission was
justified in not selecting anyone against the post of Assistant Executive
Engineers in the Irrigation wing, more particularly when the expectation of the
Commission that the Government may send a requisition there for did not materialise
even by the date of finalisation of selections.
The
question that arises in the above circumstances is whether the Government can
be compelled to send a requisition to the Commission for the selecting
Assistant Executive Engineers in respect of 44 vacant posts? and if it, can be
so compelled, would it be appropriate to direct that those posts shall be
filled by the candidates who applied for and appeared at the selection held in
the year 1985? The first thing to notice is that the Public Service Commission
had no authority to include the vacancies in the Irrigation branch in the
notification issued by it when the Government had not asked for it. The
requisition from the Government was to select Assistant Executive Engineers
only for the other two wings viz., Buildings and Roads and Public Health. May
be the Commission did so bona fide. Even so, the fact remains that none were
selected against the vacancies in the Irrigation branch, evidently because no
demand/requisition ever arrived from the Government. Merely because the 367
appellants appeared at such selection they did not get any right to compe
either the commission or the Government to select and appoint them. In deed, it
is not as if the appellants appeared only for the vacancies in Irrigation
Branch. It was a composite notification for all the three wings. The appellant
do not say that they confined their applications to Irrigation wing alone Those
selected for the other two wings had admittedly scored more marks at the
selection. Because, the appellants could not get selected against the vacancies
in the other wings, they have turned their attention to Irrigation wing. The
relevance of their attack upon the selection procedure adopted by the
Commission becomes clearer in this context. Be that as it may, the mere
appearance at the selection does not clothe them with the right to selection
and/or appointment. This is the principle affirmed by this court in State of Haryana
v. Subhash Chandra Marwaha, [1974] 3 SCC 220 and I.J.
Divakar
v. Government of Andhra Pradesh A.I.R. 1982 S.C. 1555. At the same time, we are
constrained to observe that where the Rules have created a particular category,
fixed its cadre strength and have also prescribed a quota for such category in
the matter of promotion to the higher category, the Government would not be
justified in not making appointments to such category for over a decade unless
there are very strong and good reasons therefor. The Government would not be
justified in nullifying though not in word, but in spirit the Rules in this
manner. We are also not persuaded that the defence put forward by the
Government in this case is acceptable. There is no reason why the Government
did not think it fit to make some adhoc appointments to the category of
Assistant Executive Engineers when it was recruiting such a large number, on adhoc
basis, to the category of Assistant Engineers. The situation in which the Government
finds itself today is really of its own making. The problem is no doubt real.
The
courts have to think twice before adding the numbers to the already over-loaded
service. It is not so much a question of 'punishing' the errant but one of what
to do with the surplus personnel and the consequent unwarranted burden upon the
public exchequer. On balancing the contending rights and equities, we are of
the opinion that at least part of the cadre strength of Assistant Executive
Engineers in the Irrigation branch should be filled up in the near future.
The
question then arises whether the selection held in 1985- 86 at which the
appellants had appeard, should be directed to be finalised. We do not think so.
The situation is not similar to the one considered by this court in Divakar.
That
was a case where the commission called for. applica- tions pursuant to the
requisition from the Government, held the interviews 368 and was about to finalise
the select list that the Government withdrew the requisition. In those
circumstances, this Court, while holding that the candidates who appeared for
the selection had no right to compel the commission or the Government to select
and appoint them, yet gave a direction, in the interest of justice, to finalise
the selection process and forward the select Kg to the Government. The
situation in this case, as already explained hereinbefore is totally different.
The only direction that can properly be made herein is to direct the Government
to take steps for filling up the vacancies existing in the category of
Assistant Executive Engineers in the Irrigation branch as early as possible, Atleast
half the vacancies therein should be filled within a period of one year from
today.
Before
concluding, we must refer to certian letters relied upon by Sri Shanti Bhushan
to justify the notification issued by the Commission. He relied upon the
letters of the Engineer-in-Chief dated 16.8.1985, 16/ 20.5.1986 and another
letter written in between (the date of this letter is not given) addressed to
the Government of Haryana outing that while at the moment there was no vacancy
of Assistant Executive Engineer, there was a possibility of some vacancies
arising on amount of retirement etc. He, there- fore, requested the Government
to take. steps to select persons therefor, Firstly, it may be noticed that the
appointing authority for this category being the Government, only the
Government could send the requirsition/demand to the commission and not the
Engineer-in-Chief. The aforesaid letters are merely in the nature of
recommendation to the Government. Secondly, all the three letters are
subsequent to the notification issued by the commission calling for
applications. These letters, therefore, do not justify the commission calling
for applications in respect of vacancies in the Irrigation branch.
For
the above reasons the appeals are allowed partly, A direction shall issue to
the, Government of Haryana to take steps for filling up the vacancies, in the
category of Assistant Executive Engineers in Irrigation branch of P.W.D. as
early &A possible. in accordance with law, Atleast half the vacancies shall
be filled up within am year from today.
It is
further directed that if any of the candidates who had applied in pursuance of
the 1985 Notification apply again, and if they are found to have become
age-barred, relaxation in the matter of age shall be granted to them so as to
make them eligible for consideration. No other relief co be granted In these
appeals. There shall be no order as to costs.
T.N.A.
Appeals allowed.