Sher
Singh Vs. State of Haryana & Ors [1991] INSC 1 (8 January 1991)
Punchhi,
M.M. Punchhi, M.M. Sharma, L.M. (J)
CITATION:
1991 AIR 2048 1991 SCR (1) 1 1991 SCC (3) 335 JT 1991 (1) 149 1991 SCALE (1)25
ACT:
Land
Acquisition Act, 1984-Section 25-Compensation Enhancement-Not permissible when
evidence not brought on record.
HEAD NOTE:
The
appellants were the claimants-land owners, whose lands were acquired for
establishing a residential cum- commercial complex. The Land Acquisition
Collector belting the land in three parts awarded compensation for block `A' at
the rate of Rs. 4.13 per sq.yd.; for block `B' at the rate of Rs. 2.43 per sq.yd.
and for block `C' at Rs. 1.65 per sq. yd.
In
First Appeal the High Court was persuaded to confine to belting `A' & `B'.
The High Court fixed compensation at the rate of Rs. 23 per sq.yd. for belt `A'
and for belt `B' Rs. 16 per sq. yd.
The
Claimants by special leave filed present appeals for enhancement contending
that the acquired land comprises of a large area, situated alongside the G.T.
Road in a strip approximately 3 kms. in length on the other side of which was
the railway line; that the belting had been done in a haphazard way; that the
land having been acquired for building purposes, its quality as agricultural
land should not have weighed; and compensation should have been assessed uniformally.
Dismissing
the appeals, this Court,
HELD:
1. The rate of Rs. 42 per sq.yd. is claimed on the basis that a part of land
measuring about 125 sq. yd.
which
found part of the acquired land, was, before the acquisition, purchased by a
purchaser at the rate of Rs. 42 per sq. yd. and that was an indication that the
land acquired would have fetched Rs. 42 per sq. yd. [3E]
2. The
High Court had rejected the contention of the appellants taking the twin view
that firstly the land involved was small in measure and secondly it was fully
constructed having a house and a godown facing the G.T. Road itself. This reasoning is sound.
[3F]
3. The
judgement in which Rs. 42 had been awarded in another 2 case has not been
brought on record as a piece of evidence to be relied upon by the claimants,
and no permission has been sought to adduce additional evidence. The said judgement
cannot therefore be used as a precedent even to persuade this Court to take the
view that the rate should be Rs. 42 per sq.yd. for belt `A' if not uniformally.
All these factors cumulatively lead to the view that appellants have no case
for enhancement and have been adequately compensated for the land acquired. [3H;
& A-B]
CIVIL
APPELLATE JURISDICTION: Civil Appeal Nos. 2646-52 of 1986.
From
the Judgement and order dated the 12.10.1981 of the Punjab and Haryana High Court in Regular
First Appeal Nos. 758, 760, 787, 814, 769, 1011 and 789 of 1979.
Govind
Mukhoty, R.P. Bhatt, D.K. Garg, Prem Malhotra, K.C. Sharma and R.C. Kaushik for
the Appellants.
S.P. Goel
and Mahabir Singh for the Respondents.
The Judgement
of the Court was delivered by PUNCHHI, J. This bunch of appeals and special
leave petitions are at the instance of the dissatisfied land owners whose lands
were acquired in bulk by the State of Haryana, in the town of Hissar, for establishing a
residential-cum-commercial complex.
The
land totalled approximately 331 acres. The Acquisition Collector appointed to
determine the compensation belted the land in three parts awarding for block
`A' compensation at the rate of Rs. 4.13 per sq. yd.; for block `B' at the rate
of Rs. 2.43 per sq. yd. and for block `C' at Rs. 1.65 per sq. yd. The
dissatisfied claimants took the matter in reference to the Addl.District Judge,
Hissar who maintained the belting, but raised the compensation for block `A' to
Rs. 10 per sq. yd., block `B' to Rs. 6 per sq. yd. and block `C' to Rs. 4.50
per sq. yd.
When
the matter was taken up in First Appeal before the High Court, it was persuaded
to wipe out `C' and confine it to belting `A' & `B'. The entire evidence
was considered by the High Court meticulously to come to the conclusion that
belt `A' should fetch compensation at the rate of Rs. 23 per sq. yd. and belt
`B' Rs. 16 per sq. yd. Still 3 not satisfied the claimants/appellants by
special leave have approached this Court for further enhancement.
The
goal of the appellants is that the belting as such should go and the land
should uniformally be assessed to compensation at the rate of Rs. 42 per sq.
yd. The foundation for the argument in the first instance is that the acquired
land comprises of a large area, situated alongside the G.T. Road leading from
Delhi to Hissar town in a strip approximately 3 kms. in length on the other
side of which was the railway line. It was also commented that the belting had
been done in a haphazard way. Keeping in regard the nature of the land, it was
asserted that the land having been acquired for building purposes, its quality
as agricultural land should not have weighed with the courts below and
compensation should have assessed uniformally space-wise. These arguments does
not appeal to us. Though the acquisition of ground space is the object in view,
yet the tiller's affect to keep his land more productive cannot be lost sight
of in awarding compensation. In fact the belting has kept in regard the quality
of the land. This is the reason for its appearing to be a haphazard line on the
plan. On the second limb of the argument, that it should have fetched uniform
rate of compensation, we find no supportive material on record and done has
been pressed before us on which we could change the decision, merely on the
comment that belting is normally not resorted to. We are not persuaded in the
instant case to discard the belting system and lean towards uniformity.
The
rate of Rs. 42 per sq. yd. is claimed on the basis that a part of land
measuring about 125 sq. yd. which formed part of the acquired land, was, before
the acquisition, purchased by a purchaser at the rate of Rs. 42 per sq. yd.
and
that was an indication that the land acquired would have fetched Rs. 42 per sq.
yd. The High Court had rejected the contention of the appellants taking the
twin view that firstly the land involved was small in measure and secondly it
was fully constructed having a house and a godown facing the G. T. Road itself. We find this reasoning
sound.
Having
not been able to persuade us, each of learned counsel for the appellants differently
putforth that the sole instance which the High Court had rejected had later
been relied by it in another case pertaining to other land under acquisition
under the same notification and having awarded the rate of Rs. 42 per sq. yd.
We regret our inability to entertain the argument because there is nothing on
record to support the same. The judgement in which such view has statedly been
taken has not been brought on record as a piece of evidence to be relied upon
by the claimants and no permission has 4 been sought to adduce additional
evidence. The said judgement cannot be used as a precedent even to persuade us
to take the view that the rate should be Rs. 42 per sq. yd.
for
belt `A' if not uniformally. All these factors cumulatively lead us to the view
that appellants have no case for enhancement and have been adequately
compensated for the land acquired. No interference is thus required in the
instant case.
Accordingly
for the view above taken, we dismiss the appeals as also the special leave petitions.
I.A. for condonation of delay in SLP unnumbered titled Kanhya Lal v. State of Haryana,
is dismissed as withdrawn at the askance of the learned counsel for the
appellant. There shall be no order as to costs in all these cases.
V.P.R
Appeals dismissed.