Kumar Vs. State of Rajasthan & Ors [1991] INSC 180 (9 August 1991)
Singh,
K.N. (J) Singh, K.N. (J) Sawant, P.B.
CITATION:
1992 AIR 1789 1991 SCR (3) 500 1991 SCC (4) 258 JT 1991 (3) 470 1991 SCALE
(2)352
ACT:
Motor
Vehicles Act, 1939--Section 68C--Notification dated
11.
10. 1979 to make a notified route--Delay due to conduct of affected parties by
approaching the Government and the High Court--Coming into force of the new Act
(The Motor Vehicles Act, 1988) w.e.f. 1.7.1989--Final notification dated 29.8. 1990
u/s. 100(3) of the new Act--Whether notifi- cation dated 11. 10. 1979 lapsed or
whether within limita- tion.
Motor
Vehicles Act. 1988--Sections 100, 217(2)--Object of--Pending scheme under
Section 68C of the old Act (The Motor Vehicles Act, 1939)--Final notification
issued under Section 100(3) of the new Act--Limitation--Computation.
Motor
Vehicles Act, 1988--Sections 100, 217(2)--Harmoni- ous construction--Reasons
indicated.
Interpretation
of Statutes--Harmonious Construction--Motor Vehicles Act, 1988--Sections 100
and 217(2).
HEAD NOTE:
The
appellant held a Stage Carriage Permit for plying his vehicle on the Kota-Khanpur
route, which overlaps a portion of the KotaSangod route. The State Road
Transport Corporation vide Notification dated 11.10.1979 proposed a scheme
under Section 68-C of the Motor Vehicles Act 1939 for the exclusive operation
of its vehicles on the Kota-Sangod route.
The
affected operators of the route, including the appellant, filed their
objections against the scheme before the authority appointed by the State
Government which ap- proved the scheme.
Before
the State Government could issue the final Noti- fication under Section 68-D(3)
of the old Act, the appellant and other affected operators made representation
to the Minister for Transport for affording them a fresh opportuni- ty of
hearing.
501
Meanwhile, the Motor Vehicles Act 1988 was enforced with effect from 1.7.1989
repealing the old Act.
The
appellant, thereupon, filed a writ petition before the High Court for
restraining the State Government from issuing the final Notification on the
ground that on the enforcement of the new Act, the Notification dated
11.10.1979 issued under Section 68-C of the old Act had lapsed on account of
delay in finalisation of the same.
A
similar writ petition had been filed earlier in re- spect of Kishangarh-Sarwad
route by one affected party, on similar grounds. A learned Single Judge of the
High Court dismissed that writ petition holding that the draft scheme under the
old Act was saved by the new Act and the same could legally be finalised under
the provisions of the new Act. When he filed a Letters Patent Appeal, the
Division Bench dismissed the Appeal as well as the various writ petitions
including that of the appellant by a common order, against which the present
appeal was made.
After
the judgment of the High Court, the final notifi- cation was published in the
Official Gazette on 29.8.1990 u/s. 100(3) of the new Act.
The
appellant, contended before the Court that since there was undue delay of 11
years in issuing the final Notification, the scheme as proposed under Section
68-C of the old Act should be deemed to have lapsed and the State Government
had no authority or jurisdiction to finalise the same or to issue Notification
under Section 100(3) of the new Act; that since the draft scheme dated
11.10.1979 was not finalised under Section 100(3) of the new Act, the same had
lapsed after one year from the date of the notification issued u/s. 68-C of the
old Act; and that since period of one year had already expired from the date of
the publica- tion of the scheme under Section 68-C of old Act, the scheme
automatically lapsed and the same could not be finally published under Section
100 of the new Act.
Dismissing
the appeal this Court,
HELD:
1.1.
The object and purpose of Section 100(4) is to avoid delay in finalising a
scheme. The Parliament was aware that under the old Act schemes were not finalised
for long years as a result of which public interest suffered, therefore, it prescribed
a time frame for the approval and publication of schemes. Sub-section (4)
prescribes a period of limitation during which the State Government should hear
502 and consider the objections of the objectors and finalise the scheme and
publish the same in the Official Gazette and on its failure to do so within
that period, penal conse- quences would ensue as a result of which the scheme
itself shall stand lapsed. [507H-508A, 507F-G]
1.2.
The Legislative intent is clear that the schemes proposed under Section 68-C of
the old Act pending on the date of the commencement of the new Act should not
lapse instead those schemes should be finalised in accordance with the
provisions of Section 100 of the new Act. The pending schemes were therefore
saved and the same were to be fina- lised within one year as contemplated by
Section 100(4) of the new Act. [509C-D]
1.3.
Section 217(2)(e) has been enacted to save the schemes published under Section
68-C of the old Act which were pending on the date of the commencement of the
Act with a further direction that the same shall be finalised in accordance
with Section 100 of the Act. [510C ]
1.4.
If the period of one year from the date of the publication of proposed scheme
is applied to the pending schemes under Section 68-C of the old Act, the
purpose and object of saving the old schemes under Clause (e) of Section 217(2)
of the new Act would be frustrated. [509E-F]
2.1.
While Section 217(2)(e) permits finalisation of a scheme in accordance with
Section 100 of the new Act, sub- section (4) of Section 100 lays down that a
scheme if not finalised within a period of one year shall be deemed to have
lapsed. If the period of one year as prescribed under Section 100(4) is not
computed from the date of publication of the scheme under Section 68-C of the
old Act and instead the period of one year is computed from the date of com- mencement
of the Act, both the provisions could be given full effect. [510F-H]
2.2.
While in the case of a scheme under Section 68-C of the old Act, pending on the
date of enforcement of the new Act, namely, 1.7.1989, the period of one year as
prescribed under Section 100(4) should be computed from the date of
commencement of the new Act. [511D-E]
2.3.
The appellant was himself responsible for the delay therefore he is not
entitled to complain for the delay.
Delay
would not automatically render the scheme illegal. [500G]
2.4.
Since under the old Act no time frame was pre- scribed for finalising a scheme
penal consequences could not ensue. Under the old 503 Act a scheme proposed
u/s. 68 could continue to remain in force till it was quashed. [505G-H]
2.5.
Since the scheme proposed on 11.10.1979 had not been quashed by any Court, the
same continued to be in force on the date of commencement of the new Act. In
the absence of any provision in the old Act rendering the scheme inef- fective
on the ground of delay, the scheme proposed u/s. 68-C of the old Act could not
lapse ipso facto. [505H-506A]
2.6.
In the instant case stay order passed by the High Court remained in force from
May to 9th August, 1990. On the exclusion of that period
the final Notification issued by the State Government under Section 100(3) of
the new Act on 29.8.1990 was well within the prescribed period. [512C-D] Yogeshwar
Jaiswal etc. v. State Transport Appellate Tribunal & Ors., AIR 1985 SC 516;
Onkar Singh & Ors. v. Regional Transport Authority, Agra & Ors., [1986]
3 SCC 259; Devki Nandan v. State of Rajasthan & Ors., [1987] SUPPL. SCC 438
and Srichand v. Government of U.P., [1985] 4 SCC 169, distinguished. Santosh
Kumar & Ors. v. Regional Transport Authority, CMWP No. 21773/89, decided on
16th March, 1990, over-ruled.
3.
Where there appears to be inconsistency in two sec- tions of the same Act, the
principle of harmonious construc- tion should be followed in avoiding a head on
clash. It should not be lightly assumed that what the Parliament has given with
one hand, it took away with the other. The provi- sions of one section of
statute cannot be used to defeat those of another unless it is impossible to
reconcile the same. The essence of harmonious construction is to give effect to
both the provisions.
Venkataramana
Devaru v. State of Mysore, AIR 1958'SC 225 at p.
268.-Followed.
CIVIL
APPELLATE JURISDICTION: Civil Appeal No. 3 165 of 1991.
From
the Judgment and Order dated 9.8.90 of the Rajas- than High Court in W.P. No.
2009/90.
V.A. Bobde,
and Mrs. Rani Chhabra for the Appellant.
504 Satish
Kr. Jain and Mrs. Pratibha Jain for the Respondents.
The
Judgment of the Court was delivered by SINGH, J. Special leave granted.
This
appeal is directed against the judgment and order of the High Court of
Rajasthan dated 9.8. 1990 dismissing the appellant's writ petition made under
Article 226 of the Constitution challenging the scheme for nationalisation of
the route in dispute.
The
appellant holds a Stage Carriage Permit for plying his vehicle on the Kota-Khanpur
route, which overlaps a portion of the KotaSangod route. The Rajasthan State
Road Transport Corporation, Jaipur issued a Notification on 11.10. 1979
proposing a scheme under Section 68-C of the Motor Vehicles Act, 1939
(hereinafter referred to as the 'old Act') for the exclusive operation of the
vehicles of the State Road Transport Corporation on the Kota-Sangod route. The
existing operators as well as the affected opera- tors of the route filed their
objections before the hearing authority appointed by the State Government of
Rajasthan.
The
hearing authority after considering those objections approved the scheme under
Section 68-D (2) of the old Act by its order dated 30.11. 1984 and submitted
the papers to the State Government for the issue of Notification under Section
68--D (3). Before the State Government could issue Notifica- tion under Section
68-1) (3) of the old Act, the appellant and other affected operators made
representation to the Minister for Transport for affording them a fresh opportuni-
ty of hearing. As a result of which no final Notification under Section 68-D
(3) could be issued. Meanwhile, the Motor Vehicles Act. 1988 (hereinafter
referred to as the new Act) was enforced with effect from 1.7. 1989 and the old
Act was repealed. The appellant thereupon filed a writ petition before the High
Court under Article 226 of the Constitution for the issue of Mandamus
restraining the State Government from issuing the final Notification, mainly on
the ground that on the enforcement of the new Act, the Notification dated 11.
II). 1979 issued under Section 68-C of the old Act had lapsed on account of
delay in finalisation of the same.
A
similar writ petition had been filed earlier in respect of Kishangarh-Sarwad
route by one Sardar Mohd. on similar grounds. A learned single Judge of the
High Court dismissed that writ petition holding that the draft scheme under the
old Act was saved by the new Act and the same could legally be finalised under
the provisions of the new Act. Sardar Mohd. filed a Letters Patent Appeal
against the judgment of the learned single Judge. A 505 Division Bench of the
High Court disposed of the Letters Patent Appeal of Sardar Mohd. as well as the
various writ petitions including that of the appellant by a common order dated
9.8. 1990 impugned in the present appeal.
After
the impugned judgment of the High Court, the State Government approved the
Scheme as proposed under 68-C of the old Act. Final notification approving this
Scheme was pub- lished in the Official Gazette on 29.8.1990 u/s 100(3) of the
new Act, as a result of which the Kota-Sangod route has become a notified route,
consequently the appellant has no right to ply his vehicle on the overlapping
portion of that route.
Learned
counsel for the appellant urged that since there was undue delay of 11 years in
issuing the final Notifica- tion, the scheme as proposed under Section 68-C of
the old Act should be deemed to have lapsed and the State Government had no
authority or jurisdiction to finalise the same or to issue Notification under
Section 100(3) of the new Act. He placed reliance on a number of decisions of
this Court in support of his contention that unreasonable delay in fina- lising
a scheme proposed under Section 68-C of the old Act rendered the same illegal.
He referred to the decisions of this Court in Yogeshwar Jaiswal etc. v. State
Transport Appellate Tribunal & Ors., AIR 1985 SC 5 16; Onkar Singh &
Ors. v. Regional Transport Authority, Agra & Ors., [1986] 3 SCC 259; Devki Nandan
v. State of Rajasthan & Ors., [1987] Suppl. SCC 438 and Srichand v.
Government of U.P., [1985] 4 SCC 169. No doubt in these decisions the Court
quashed the schemes proposed under Section 68-C of the old Act on the ground of
inordinate delay for which there was no valid explanation. In the instant case,
the proposed scheme had been approved by the hearing authority under Section
68-D (2) of the old Act in 1984 within five years of the proposal of the scheme
but when the matter was placed before the State Government for issue of final
Notification Under Section 68-D (3) of the old Act, the appellant and other
affected operators approached the Minister for Transport and stalled the issue
of final Notification as a result of which delay was caused. The appellant was
himself responsible for the delay therefore he is not entitled to complain of
the delay. Moreover this Court has not ruled in the aforesaid decisions, or in
any other decision that delay would auto- matically render the scheme illegal.
Since under the old Act no time frame was prescribed for finalising a scheme
penal consequences could not ensue. Under the old Act a scheme proposed u/s 68
could continue to remain in force till it was quashed. Since the scheme
proposed on 11.10.1979 had not been 506 quashed by any Court, the same
continued to be in force on the date of commencement of the new Act. In the
absence of any provision in the old Act rendering the scheme ineffec- tive on
the ground of delay, the scheme proposed u/s 68-C of the old Act could not
lapse ipso facto. Moreover, now the State Government has already issued final
Notification under Section 100(3) of the new Act on 29.8. 1990, as a result of
which the route has been notified. In this view ratio of the aforesaid
decisions of the Court are not applicable to the instant case at this stage.
Learned
counsel for the appellant urged that under Section 100(4) of the new Act, if a
draft scheme is not finalised and the final notification is not issued within
one year from the date of the publication of the proposed scheme, the same
would lapse. Since in the instant case the draft scheme dated 11.10.1979 was
not finalised under Sec- tion 100(3) of the new Act the same had lapsed after
one year from the date of the notification issued u/s 68-C of the old Act. In
order to appreciate this contention it is necessary to consider the relevant
provisions of the new Act. Chapter VI of the new Act contains special provisions
relating to State Transport Undertakings. Section 99 confers power on the State
Government to propose a scheme for oper- ating the vehicles of the State
Transport Undertakings to the exclusion of other persons. The proposed scheme
is published in the Gazette. Section 100 which provides for filing of the
objections before the State Government and the issue of final notification, is
as under:
"100.
Objection to the proposal-- (1) on the publication of any proposal regard- ing
a scheme in the Official Gazette and in not less than one newspaper in the
regional language circulating in the area or route which is to be covered by
such proposal any person may, within thirty days from the date of its
publication in the Official Gazette, file objections to it before the State
Govern- ment.
(2)
The State Government may, after consider- ing the objections and after giving
an oppor- tunity to the objector or his representatives and the representatives
of the State Transport Undertaking to be heard in the matter, if they so
desire, approve or modify such proposal.
(3)
The scheme relating to the proposal as approved or 507 modified under
sub-section (2) shall be pub- lished in the Official Gazette by the State
Government making such scheme and in not less than one newspaper in the
regional language circulating in the area or route covered by such scheme and
the same shall thereupon become final on the date of its publication in the
Official Gazette and shall be called the approved scheme and the area or route
to which it relates shall be called the notified area or notified route:
Provided
that no such scheme which relates to any interState route shall be deemed to be
an approved scheme unless it has the previous approval of the Central
Government.
(4)
Notwithstanding anything contained in this section, where a scheme is not
published as an approved scheme under sub-section (3) in the Official Gazette
within a period of one year from the date of publication of the proposal
regarding the scheme in the Official Gazette under sub-section (1), the
proposal shall be deemed to have lapsed.
Section
100 provides for filing of objections before the State Government within 30
days from the date of the publi- cation of the proposed scheme in the Official
Gazette. Under sub-section (2) the State Government may approve or modify the
proposed scheme after considering the objections and hearing the objectors.
Under sub-section (3) the State Government is required to publish the approved
scheme in the Official Gazette and also in one newspaper. On the publica- tion
of the approved scheme in the Official Gazette, the area or route to which it
relates shall be called the noti- fied area or notified route. Sub-section (4) lays
down that if a scheme is not published as an approved scheme in the Gazette
within one year from the date of publication of the proposed scheme in the
Official Gazette, the proposed scheme shall be deemed to have lapsed.
Sub-section (4) in our opinion prescribes a period of limitation during which
the State Government should hear and consider the objections of the objectors
and finalise the scheme and publish the same in the Official Gazette and on its
failure to do so with in that period, penal consequences would ensue as a
result of which the scheme itself shall stand lapsed. The object and purpose of
Section 100(4) is to avoid delay in finalising a scheme. The Parliament was
aware that under the old Act schemes were not 508 finalised for long years as a
result of which public inter- est suffered, therefore, it prescribed a time
frame for the approval and publication of schemes.
The
provisions of Section 100 are applicable to the schemes proposed under the new
Act. The question is whether it would apply to a scheme proposed under Section
68-C of the old Act. The Legislature was conscious that a number of schemes
proposed under the old Act were pending approval on the date of the
commencement of the Act, it therefore made a provision for saving those schemes
by enacting Section 2 17 of the Act, which is as under:
"217.
Repeal and savings--(1) The Motor Vehi- cles Act, 1939 (4 of 1939) and any law corre-
sponding to that Act in force in any State immediately before the commencement
of this Act in that State (hereinafter in this Section referred to as the
repealed enactments) are hereby repealed.
(2)
Notwithstanding the repeal by sub-section (1) of the repealed enactments-- (a)
any notification, rule, regula- tion, order or notice issued, or any appoint- ment
or declaration made or exemption granted, or any confiscation made, or any
penalty or fine imposed, any forfeiture cancellation or any other thing done,
or any other action taken under the repealed enactments, and in force
immediately before such commencement shall, so far as it is not inconsistent
with the provisions of this Act, be deemed to have been issued, made, granted,
done or taken under the corresponding provision of this Act;
......................................
.....................................
(e)
any scheme made under section 68-C of the Motor Vehicles Act, 1939 (4 of 1939)
or under the corresponding law, if any, in force in any State and pending
immediately before the commencement of this Act shall be disposed of in
accordance with the provisions of section 100 of this Act;
(f)
the permits issued under sub-section (I-A) of section 68-F of the Motor
Vehicles Act, 1939 (4 of 1939), or under 509 the corresponding provisions, if
any, in force in any State immediately before the commence- ment of this Act
shall continue to remain in force until the approved scheme under Chapter VI of
this Act is published.
...................................
Under
sub-section (1) the old Act has been repealed but under subsection (2) inspite
of repeal the Parliament has made provisions for saving the schemes proposed
under Sec- tion 68-C of the old Act. Clause (e) of Section 217 (2) of the new
Act provides that notwithstanding the repeal of the old Act a scheme proposed
under Section 68-C of the old Act, if pending immediately before the
commencement of the Act shall be finalised in accordance with the provisions of
Section 100 of the new Act. The Legislative intent is clear that the. schemes
proposed under Section 68-C. of the old Act pending on the date of the
commencement of the new Act should not lapse instead those schemes should be finalised
in accordance with the provisions of Section 100 of the new Act. The pending
schemes were therefore saved and the same were to be finalised within one year
as contemplated by Section 100 (4) of the new Act. Section 100 (4) lays down
that if the proposed scheme is not finalised within one year from the date of
its publication in the Official Gazette, it shall be deemed to have lapsed but
that applies to a scheme proposed under the new Act and not to a scheme
proposed under Section 68-C of the old Act. If the period of one year from the
date of the publication of the proposed scheme is applied to the pending
schemes under Section 68-C of the old Act, the purpose and object of saving the
old schemes under Clause (e) of Section 2 17 (2) of the new Act would be
frustrated.
Learned
counsel for the appellant urged that since Section 17(2)(e) provides for the finalisation
of a pending scheme published under the old Act in accordance with the provi- sions
of Section 100 of the new Act, the period of limita- tion of one year
prescribed under sub-section (4) of that section would also apply. He further
urged that since period of one year had already expired from the date of the publi-
cation of the scheme under Section 68-C of old Act, the scheme automatically
lapsed and the same could not be final- ly published under Section 100 of the
Act.
If the
appellant's contention is accepted the schemes published under Section 68-C of
the old Act would lapse after the expiry of the period of one year from the
date of the publication of the scheme in 510 the Official Gazette in accordance
with the provisions of the old Act. On the other hand we find that Section 2
17(2)(e) permits finalisation of a scheme published under Section 68-C of the
old Act if the same was pending on the date of the commencement of the new Act.
The old Act did.
not
provide any period of limitation consequently a number of schemes published
under Section 68-C of the old Act were pending on the date of commencement of
the new Act although a period of one year had already expired. If the
Parliament intended to apply the limitation of period of one year to the
pending schemes published under Section 68-C of the old Act, the new Act could
have made provisions to that effect.
On the
contrary Section 217(2)(e) has been enacted to save the schemes published under
Section 68-C of the old Act which were pending on the date of the commencement
of the Act with a further direction that the same shall be fina- lised in
accordance with Section 100 of the Act. Sub-section (4) of Section 100 provides
that where a scheme is not published as approved under sub-section (3) within
period of one year from the date of publication of the proposal in the Official
Gazette under sub-section (1), the proposal shall be deemed to have lapsed. A
scheme published under Section 68-C of the old Act pending on the date of
commencement of the Act could not be a scheme proposed under sub-section (1) of
Section 100, therefore, the rigour of period of one year as applicable to a
scheme proposed under sub-section (1) of Section 100 could not apply to a
scheme under Section 68-C pending on the date of commencement of the Act. It
was not meant that a scheme u/s 68-C of the old Act pending on the date of
commencement of the new Act may be approved or finalised with leisure without
any time limit.
There
appears to be some apparent conflict between Section 100(4) and Section 217(2)(e)
of the Act. While Section 217(2)(e) permits finalisation of a scheme in ac- cordance
with Section 100 of the new Act sub-section (4) of Section 100 lays down that a
scheme if not finalised within a period of one year shall be deemed to have
lapsed. If the appellant's contention is accepted then Section 217(2)(e) will
become nugatory and no scheme published under Section 68-C of the old Act could
be finalised under the new Act. On the other hand if the period of one year as
prescribed under Section 100(4) is not computed from the date of publication of
the scheme under Section 68-C of the old Act and instead the period of one year
is computed from the date of com- mencement of the Act both the provisions
could be given full effect.
It is
settled principle of interpretation that where there appears 511 to be
inconsistency in two sections of the same Act, the principle of harmonious
construction should be followed in avoiding a head on clash. It should not be
lightly assumed that what the Parliament has given with one hand, it took away
with the other. The provisions of one section of stat- ute cannot be used to
defeat those of another unless it is impossible to reconcile the same. In Venkataramana
Devaru v. State of Mysore, AIR 1958 SC 225 at p. 268, this Court observed:
"The
rule of construction is well-settled that when there are in an enactment two provisions
which cannot be reconciled with each other, they should be so interpreted that,
if possi- ble, effect should be given to both. This is what. is known as the
rule of harmonious construction." The essence of harmonious construction
is to give effect to both the provisions. Bearing these principles in mind it
is legitimate. to hold that Section 100(4) prescribed period of limitation of
one year in respect the scheme proposed under the provisions of the new Act,
while in they case of a scheme under Section 68-C of the old Act, pending on
the date of enforcement of the new Act, namely, 1.7. 1989, the period one year
as prescribed under Section 100(4) should be computed from the date of
commencement of the new Act. This interpretation would give full effect to both
the Sections--Section 100(4) and Section 2 17(2)(e) of the new Act.
Learned
counsel for the appellant placed reliance on a Division Bench decision of the
Allahabad High Court in Santosh Kumar & Ors. v. Regional Transport
Authority, CMWP No. 2 1773/89, decided on 16th March, 1990. In that case a Division Bench of
Allahabad High Court held that a draft scheme under Section 68-C of the old Act
published in 1986 shall be deemed to have lapsed on the date of the enforce- ment
of the new Act in view of the absolute prohibition contained in Section 100(43
of the new Act against the continuance of any scheme after one year. We have
gone through the judgment of the Division Bench carefully but in our opinion
the view taken by the High Court of Allahabad is unsustainable in law. The
learned Judges constituting the Bench failed to notice the legislative
intendment under Section 217(4)(e) of the new Act which kept alive the scheme
published under Section 68-C of the old Act for the purposes of being finalised
under the new Act. We are therefore clearly of the opinion that the view taken
by the Allahabad High Court is incorrect.
In the
instant ease, the appellant had filed a writ petition in May, 512 1990 and
obtained an interim order from the High Court restraining the State Government
from publishing the final Notification under Section 100(3) of the new Act. The
State Government published the final notification under Section 100(3) of the
new Act on 29.8. 1990 after the dismissal of the writ petition by the Division
Bench of the High Court.
The
period of one year with regard to the pending scheme expired on 1.7.1990 but
since the appellant had obtained stay order from the High Court, the State
Government could not publish final notification. Explanation to Section 100(4)
of the new Act lays down that in computing the period of one year any period
during which the publication of the approved scheme under Section 100 is held
up on account of any stay or order of any court, shall be excluded. On the
application of the Explanation the period during which the appellant had
obtained stay order against the State Govern- ment is liable to be excluded in
computing the period of one year. Admittedly in the instant case stay order
passed by the High Court remained in force from May to 9th August, 1990. On the exclusion of that period
the final notification issued by the State Government under Section 100(3) of
the new Act on 29.8.1990 was well within the prescribed period.
In
view of the above discussion, we are of the opinion that the High Court rightly
dismissed the appellant's writ petition. The appeal fails and is accordingly
dismissed with costs.