Smt. Aslhing @ Lhingjanong Vs. L.S.
John & Ors [1983] INSC 182 (22 November 1983)
FAZALALI, SYED MURTAZA FAZALALI, SYED MURTAZA
REDDY, O. CHINNAPPA (J) VENKATARAMIAH, E.S. (J)
CITATION: 1984 AIR 988 1984 SCR (1) 863 1984
SCC (1) 205 1983 SCALE (2)813
ACT:
Contract-When a party writes to the opposite
party that it is closing the contract, does the contract subsist ?
HEADNOTE:
The respondent who was a party to a
subsisting contract with the Government for widening or a road wrote a letter
to the concerned Executive Engineer stating that he was closing the said
contract. 1 he appellant contended that the contents of the letter did not have
the effect of putting an end to the contract.
Dismissing the appeal,
HELD: After the letter, the contract came to an
end by breach and was no longer subsisting. Acceptance of the letter by the
authorities was unnecessary for putting an end to the contract although the
breach may give rise to an action for damages. [864 B-C]
CIVIL APPELLATE JURISDICTION: Civil Appeal No.
11 89 of 1982.
From the Judgment and order dated the 18th
December, 1981 of the Gauhati High Court in Election Petition No. 1 of 1980.
S Rangarajan, S.K. Nandy and S. Parikh for
the Appellant.
A.K Nag for the Respondent.
The Judgment of the Court was delivered by
FAZAL ALI, J. In this election appeal the only point for determination is
whether at the time when respondent No. I filed his nomination paper he held a
subsisting contract with the Government for widening the PLP road.. While it is
true that there was such a contract in existence prior to 30:11.1979,
respondent No. 1 wrote a 864 letter on 30.11.1979 to the concerned Executive
Engineer stating that he was closing the said contract. The last date for
filing nomination was 10.12.1979. It is argued that the contents of the said
letter does not have the effect of putting an end to the contract. After going
through the contents of the letter it is absolutely clear that the contractor
unilaterally put an end to the contract and informed the Department concerned
accordingly and also he had resigned from the contractor's list of PWD Manipur.
Thus after this letter the contract came to an end by breach and the contract
was no longer subsisting. Mr. Rangarajan has submitted some very nice and
delicate questions for consideration. One of them-being that until and unless
the letter is accepted by the Authority the contract would continue and thus
the respondent would suffer from the disqualification. In our opinion having
regard to the contents of the letter it is not possible to accept the argument
of Mr. Rangarajan that the contract was subsisting.
The acceptance of the letter by the
authorities was unnecessary for putting an end to the contract although the
breach may give rise to a cause on action for damages. No other point is raised
before us. We do not find any merit in this appeal and it is dismissed without
any order as to costs.
H.L. C. Appeal dismissed.